6 Commissioning/Start-up/Shutdown
56 of 116
CHTRa
6.2.9.4 Mounting the sound insulating hood
If applicable, mount the sound insulating hood as described in the manufacturer’s
product literature.
6.2.10 Functional test and adjustment of the instruments
DANGER
Overload due to incorrectly set monitoring and alarm equipment
Seal failure!
Explosion hazard
Rick of injury resulting from leakage of hot or pressurised fluid.
▷
Connect and activate all monitoring and alarm equipment installed.
▷
Check all instruments in accordance with the manufacturer's product literature
for correct measuring data and adjust the instruments, if required.
▷
Set the warning and shutdown values in cooperation with control engineering
specialists.
6.2.11 Checking the shaft seal
DANGER
Improper connection of auxiliary lines
Explosion hazard from escaping leakage or fluid!
▷
Correctly install the auxiliary lines.
▷
Observe the maintenance and monitoring schedules.
▪
Check the mechanical seal’s readiness for operation.
▪
Remove the assembly fixtures, if required.
▪
Check all the required connections are correctly fitted (see general assembly
drawing or seal manufacturer's product literature).
Mechanical seal
The mechanical seal only leaks slightly or invisibly (as vapour) during operation.
Mechanical seals are maintenance-free.
Observe the manufacturer’s product literature.
6.2.12 Setting the lube oil supply (if applicable)
The functional test of the pressure switches is possible by throttling the valve even
during standstill of the pump.
CAUTION
Improper maintenance
Damage to the pump set!
Insufficient lubrication!
▷
Only make adjustments when oil operating temperature has been reached.
▷
No oil is allowed to escape between labyrinth ring (423) and shaft (210)!
1. Set the switching points of the pressure switches for switching the auxiliary oil
pump on and off as well as for enabling and switching off the drive.
2. Adapt the pre-drilled orifice plates on the lube oil outlets to the gear or variable
speed coupling and operate in accordance with the relevant manufacturer's
documentation.
3. Check the oil level and top up, if required.
4. Switch on the oil supply unit or auxiliary oil pump and check the oil pressure.
Содержание CHTRa
Страница 1: ...Process Pump CHTRa Installation Operating Manual...
Страница 112: ...10 Related Documents 112 of 116 CHTRa 10 5 Order specific documents...
Страница 114: ...Index 114 of 116 CHTRa W Warnings 9 Warranty claims 7 Weight 110...
Страница 115: ......
Страница 116: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 2700 81 03 EN...