![KSB Amacan S 1000-600 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/ksb/amacan-s-1000-600/amacan-s-1000-600_installation-and-operating-manual_2006554051.webp)
7 Servicing/Maintenance
51 of 126
Amacan S
1589.837/01-EN
WARNING
Hot surface
Risk of injury!
▷
Allow the pump set to cool down to ambient temperature.
WARNING
Improper lifting/moving of heavy assemblies or components
Personal injury and damage to property!
▷
Use suitable transport devices, lifting equipment and lifting tackle to move
heavy assemblies or components.
WARNING
Insufficient stability
Risk of crushing hands and feet!
▷
During assembly/dismantling, secure the pump (set)/pump parts to prevent
tilting or tipping over.
A regular maintenance schedule will help avoid expensive repairs and contribute to
trouble-free, reliable operation of the pump, pump set and pump parts with a
minimum of servicing/maintenance expenditure and work.
NOTE
All maintenance work, service work and installation work can be carried out by KSB
Service or authorised workshops. For contact details refer to the enclosed
"Addresses" booklet or visit "
Never use force when dismantling and reassembling the pump set.
7.2 Maintenance/inspection
KSB recommends the following regular maintenance schedule:
Table 10:
Overview of maintenance work
Maintenance interval
Maintenance work
For details see ...
Every 4000 hours, at least once a
year
Measure the insulation resistance.
Every 8000 hours, at least every
3 years
Check the cable bundle.
Check the earth conductor.
Check the sensors.
Check the mechanical seal leakage.
Change the lubricant.
Every 16,000 hours, at least
every 5 years
Lubricate the rolling element bearings.
General overhaul
On pump sets with sacrificial anodes, the sacrificial anodes must initially be checked
after 6 months. If necessary, the sacrificial anodes must be replaced. If the sacrificial
anodes show little wear, the maintenance interval can be extended to 12 months.