1.
For prolonged shutdown periods, start up the pump set regularly between once
a month and once every three months for approximately one minute.
This will prevent the formation of deposits within the pump and the pump
intake area.
The pump (set) is removed from the pipe and stored
✓
All safety regulations are observed.
1.
Clean the pump set.
2.
Preserve the pump set.
3.
Observe the instructions given in.
6.4 Returning to service
For returning the pump set to service observe the sections on commissioning/start-up
and operating limits.
For returning the product to service after storage also follow the instructions for
servicing/inspection.
WARNING
Failure to re-install or re-activate protective devices
Risk of personal injury from moving parts or escaping fluid!
▷
As soon as the work is completed, re-install and/or re-activate any safety-
relevant and protective devices.
NOTE
On pumps/pump sets older than 5 years we recommend replacing all elastomer
seals.
6 Commissioning/Start-up/Shutdown
30 of 68
Amacan P