
Operation
8
Completing the baling process, starting tying cycle and ejecting round bales
8.4
Comprima F 155 XC
Original Operating Instructions 150001050_01_en
73
8.4
Completing the baling process, starting tying cycle and ejecting
round bales
Read off the status of the bale chamber filling on the terminal,
Stop the tractor.
Start the tying process in automatic mode or start it in manual mode.
Wait until the tying process is complete.
Special feature of version with "Net and chamber film wrapping" and active chamber
film wrapping:
When starting chamber film wrapping, pick up crops until the film is caught by the round bale
and the film roll starts to rotate.
Open the tailgate and eject the round bale.
Close the tailgate.
Start the next baling process.
8.5
Operating the support jack
INFORMATION
In order to increase the base of the support jack when the ground is soft, use a suitable
support.
The support jack is used to keep the machine stable when it is not connected to the tractor. The
support jack must be used whenever the machine is parked.
ü
The machine is shut down and safeguarded,
.
ü
The machine is connected to the tractor,
.
For version with "Mechanical support jack"
1
2
3
4
RPG000-063
Moving the support jack into support position
Turn the crank handle (1) several revolutions anti-clockwise.
WARNING! Crush hazard due to the support jack! Keep hands and feet out of the danger
zone of the support jack.
Pull out the securing pin (4), extend the parking support (2) and secure the position using
the securing pin (4).
Turn the support jack (2) anti-clockwise firmly down onto the ground using the crank
handle (1) until the drawbar is relieved.