![Krone Big Pack 1270 XC Скачать руководство пользователя страница 206](http://html1.mh-extra.com/html/krone/big-pack-1270-xc/big-pack-1270-xc_original-operating-instructions_2004793206.webp)
15
Driving and Transport
15.7
Preparing the machine for shipment
206
BiG Pack 1270 XC
Original Operating Instructions 150000748_01_en
15.7
Preparing the machine for shipment
WARNING
Risk of accident due to unsecured machine parts
If the machine is not secured properly during tranpsort on lorries or trains, the parts may come
loose unintentionally due to airstream. This may result in serious accidents.
Carry out the following measures to secure moving machine parts.
Securing side hood
BP000-187
Right and left machine side
Open side hood (1),
Guide a cable tie (2) through the openings of the flap locking device (3).
Place the cable tie (2) around the lock (4) and tighten it.
Securing the guide wheels
BP000-188
Right and left machine side
Raise the pick-up (1) and lock it,
Guide a cable tie (4) through the borehole (2) and through the frame of the guide wheel (3).
Tighten the cable tie (4).
Содержание Big Pack 1270 XC
Страница 29: ...Safety 2 Safety labels on the machine 2 5 BiG Pack 1270 XC Original Operating Instructions 150000748_01_en 29 ...
Страница 370: ...II T P LS I III IV T P S1 S2 M1 M2 V1 V2 P1 B1 A1 B2 B1 T1 T T4 P 180 bar B36 100 bar B11 B35 150101911_00 2 4 ...
Страница 372: ...B17 K9 K11 K12 B B1 A A1 1 2 3 K13 3 4 5 1 2 150101911_00 3 4 ...
Страница 374: ...B17 K11 1 2 150101911_00 4 4 ...
Страница 376: ... LUFXLW GLDJUDP GRFXPHQW QR YHUVLRQ ODUJH VTX XDUH EDOHU L 3 LJK 6SHHG XW 9DUL XW 3 3 1 0HGLXP RPIRUW IURP PDFKLQH QR ...