
Settings
279
Pos: 93.83.12 /BA/Ei nstellungen/Gr oßpackenpr esse/Presskol beneinstellung/Laufschi enenrei nigung @ 24 \mod_1241423347774_78.docx @ 243762 @ 3 @ 1
19.14.3
Cleaning the running rails
Fig. 202
The cleaning rails (2) are positioned on the four rollers (3). They remove dirt deposits from the
running rails of the baling ram. To adjust, loosen the screws (1) and adjust the cleaning rails to
the dimension a = 1 - 2 mm. Tighten the screws again.
Note
The cleaning rails (2) must be able to tilt easily on the roller axis!
Pos: 93.83.13 /BA/Ei nstellungen/Gr oßpackenpr esse/Presskol beneinstellung/Seitliche Ei nstellung des Kolbens @ 24 \mod_1241423485915_78.docx @ 243786 @ 3 @ 1
19.14.4
Lateral setting of the plunger
Fig. 203
The baling ram must be aligned in the centre of the bale channel chamber.
Make sure that the plunger moves freely and does not scrub against the fixed scrapers in the
bottom of the channel and below the knotter mechanism.
To align the plunger laterally, the plunger (2) can be moved to its forward-most position by
turning the flywheel.
The plunger (2) can be aligned laterally with compensating plates (1) (283-676-0) that are
mounted between the plunger (2) and the sliding discs (3). The plunger should have a gap
dimension of a = 1 - 2 mm at the narrowest point of the bale channel chamber.
Pos: 93.83.14 /Layout M odul e /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Содержание 870 HDP
Страница 380: ...FLUFXLW GLDJUDP 1 LJ3DFN EDOHU L 3 LJK 6SHHG 3 ...