krom schroeder TC 1 Скачать руководство пользователя страница 3

TC 1, TC 2, TC 3 · Edition 07.22

EN-3

3 InstALLAtIon

 CAUtIon

Please observe the following to ensure that the 
unit is not damaged during installation: 

 

– Dropping the device can cause permanent 

damage. In this event, replace the entire device 
and associated modules before use. 

 

– Avoid formation of condensation in the device.

 

– Do not store or install the unit in the open air.

 

– Check max. inlet pressure.

 

– Use a suitable spanner. Do not use the device 

as a lever. Risk of external leakage.

 

Installation in the vertical or horizontal position, 
housing cover/indicators must not point upwards 
or downwards. The electrical connection should 
preferably be pointing downwards or towards the 
outlet.

 

The device must not be in contact with masonry. 

Minimum clearance 20 mm (0.78").

 

Use the O-rings supplied.

 

In the case of very large test volumes V

P

, an in-

stalled relief line should be of nominal size 40 to 
allow for the discharge of the test volume V

P

3.1 Mounting tC 1V to valVario controls

 1 

Disconnect the system from the electrical power 

supply.

 2 

Close the gas supply.

 3 

 

 4 

 

 5 

 

The O-rings must be inserted in the connectors 

of the TC.

 

The solenoid actuator cannot be rotated on so-

lenoid valves with proof of closure switch VCx..S 

or VCx..G.

 

Connect the TC to the inlet pressure connection p

u

 

and the interspace pressure connection p

z

 of the 

inlet valve. Ensure that connections p

u

 and p

z

 on 

the TC and the gas solenoid valve are not reversed. 

 

TC and bypass/pilot gas valve cannot be fitted 

together on the same side of the double block valve.

 

In the case of a VCx combination, it is recommend-
ed to always install the bypass/pilot gas valve on the 
rear of the second valve and the tightness control 
on the viewing side of the first valve, together with 
the connection box.

 

The TC is secured using two captive, self-tapping 

combination Torx screws T20 (M4) inside the hous-
ing. Do not undo any other screws!

Torx T20

VAs 1–3, VCx 1–3

 a 

 

 b 

p

z

p

u

 

 c 

max. 250 Ncm

 

Tighten the screws with max. 250 Ncm.

VAs 6–9, VCx 6–9

 a 

 

 b 

p

u

p

z

 

 c 

max. 250 Ncm

 

Tighten the screws with max. 250 Ncm.

3.2 Mounting tC 1C to combination control CG

 1 

Disconnect the system from the electrical power 

supply.

 2 

Close the gas supply.

 3 

 

 4 

 

 5 

 

The O-rings must be inserted in the connectors 

of the TC.

 

Use the adapter plate supplied to mount the TC 1C 
to combination control CG.

 

Connect the TC to the inlet pressure connection p

u

 

and the interspace pressure connection p

z

 of the 

inlet valve. Ensure that connections p

u

 and p

z

 on 

the CG are not reversed. 

 6 

 

 7 

p

z

p

u

 

 8 

p

z

p

u

 

 9 

 

 10 

 

 11 

 

Tighten the screws with max. 250 Ncm.

Содержание TC 1

Страница 1: ...r This unit must be installed and commissioned in accordance with the regulations and standards in force These instructions can also be found at www docuthek com 1 2 Explanation of symbols 1 2 3 a b c Action Instruction 1 3 Liability We will not be held liable for damage resulting from non observance of the instructions and non com pliant use 1 4 Safety instructions Information that is relevant fo...

Страница 2: ...ype code TC 1C TC 2 TC 3 TC Tightness control 1C For attachment to CG 2 For quick opening individual valves 3 For quick or slow opening individual valves R Rp internal thread N NPT internal thread 05 pu max 500 mbar W Mains voltage 230 V AC 50 60 Hz Q Mains voltage 120 V AC 50 60 Hz K Mains voltage 24 V DC W Control voltage 230 V AC 50 60 Hz Q Control voltage 120 V AC 50 60 Hz K Control voltage 24...

Страница 3: ... with proof of closure switch VCx S or VCx G Connect the TC to the inlet pressure connection pu and the interspace pressure connection pz of the inlet valve Ensure that connections pu and pz on the TC and the gas solenoid valve are not reversed TC and bypass pilot gas valve cannot be fitted together on the same side of the double block valve In the case of a VCx combination it is recommend ed to a...

Страница 4: ...not reversed pz pz pd pu TC 3 R Rp TC 3 N NPT Use a 12 x 1 5 or 8 x 1 pipe for the pipe con nections pu pd pz 1 Mount TC 3 Only use approved sealing material to seal the pipe connections 2 Seal the unused connection pz on the TC using the sealing plug supplied 4 WIRING WARNING Risk of injury Please observe the following to ensure that no damage occurs Electric shocks can be fatal Before working on...

Страница 5: ... glands are to remain closed with a plug Otherwise dirt or moisture can penetrate the housing 8 Wire as shown on the connection diagram For PE wire connection 5 PE terminals are available for forwarding They are designed as distributor terminals e g to connect the PE wires of the valves to the system PE connection to the system PE must be carried out wired by the user Connection diagram for TC 1 T...

Страница 6: ...of malfunction Continue with page 6 7 Setting the measure ment time 7 SETTING THE MEASUREMENT TIME The measurement time tM can be set with a jumper in increments of 5 s to max 30 s tM is set to 30 s at the factory tM 5s 10s 15s 20s 25s 30s No jumper no function The operating signal LED is permanently red see page 8 9 Assistance in the event of malfunction The longer the measurement time tM the gre...

Страница 7: ...ing the measurement time tM is available at www adlatus org Calculation example Qmax 100 m3 h pu 100 mbar VP VV L x VR 7 l QL 100 m3 h x 1000 1000 100 000 l h 1000 100 l h tM s 2 5 x pu mbar x VP l QL l h 2 5 x 100 x 7 100 17 5 s Set the next highest value in this example 20 s 7 5 Setting the measurement time on the device To set the calculated measurement time the jumper in the device must be rec...

Страница 8: ...operating status In the case of untested valves the 1 and 2 LEDs are yellow There is mains voltage at terminal 1 and renewed test after switching off the voltage to termi nal 10 thermostat start up signal During the test the 1 and 2 LEDs will flash yellow 8 4 After the test The 1 and 2 LEDs are green Both valves are tight Mode 1 or Mode 3 the enable signal is issued via terminal 6 when voltage is ...

Страница 9: ...oo many remote resets More than 5 resets have been conducted within the last 15 minutes either automatically or manually Consecutive fault caused by a previous fault whose actual cause has not been remedied Pay attention to previous fault messages Remedy cause Then press the reset button 1 or 2 LED is permanently red The valve is leaking The TC performs a fault lock out Replace the valve Wiring of...

Страница 10: ... 60 Hz 230 V AC 15 10 50 60 Hz 24 V DC 20 Power consumption all LEDs green 5 5 W at 120 V AC and 230 V AC 2 W at 24 V DC TC 3 plus 8 VA for an auxiliary valve Fine wire fuse 5 A slow acting H 250 V pursuant to IEC 60127 2 5 F1 protection of valve outputs terminals 15 and 16 fault signal terminal 12 and supply of the control inputs terminals 2 7 and 8 F2 protection of safety interlock controller en...

Страница 11: ...ion is subject to the surveillance proce dure pursuant to Regulation EU 2016 426 Annex III paragraph 3 Elster GmbH 14 3 SIL and PL Safety specific characteristic values see Safety manual Technical Information TC D GB F www docuthek com 14 3 1 Safety specific characteristic values for SIL and PL Mains and control voltage 120 V AC 230 V AC Diagnostic coverage DC 91 4 Mean probability of dangerous fa...

Страница 12: ...ponding recycling centre Do not dispose of the unit with the usu al domestic refuse Do not burn the product On request old units may be returned carriage paid to the manufacturer in accordance with the relevant waste legislation requirements 2022 Elster GmbH We reserve the right to make technical modifications in the interests of progress The Honeywell Thermal Solutions family of products includes...

Отзывы: