Krom Schroder VGBF 15R Скачать руководство пользователя страница 3

GB-3

D

GB

F

NL

I

E

Installing the impulse line

VGBF 40 – 150..05 for 500 mbar

No external impulse line required. VGBF..05 fea-
tures an internal feedback function.

VGBF 40 – 100..40 for 4 bar

In order to avoid possible oscillations, a damp-
ing valve should be fitted. The damping valve is 
secured to the spring dome with an adhesive 
strip on delivery. 

Impulse line: 12.5 × 1.5 mm. 

VGBF 40 – 100

3

1

2

5

4

Push union 

nut and 

compression 

fitting onto 

the impulse 

line.

VGBF 15 – 100..10 for 1 bar and  

VGBF 15 – 100..40 for 4 bar
  6 

Install the impulse line and seal with an approved 
sealing material.  

VGBF 15 – 25R

Rp 

1

/

4

5xDN

VGBF 40 – 150

5xDN

Rp 

3

/

8

Tightness test 

Also after maintenance.

  1 

Block the pipeline at the inlet and outlet.

  2 

Slowly apply inlet pressure p

e

.

(p

e

 ≤ 1.5 × p

e max.

, see type label) 

   

Slowly apply outlet pressure p

a

(p

a

 ≤ 1.5 × p

a

, see type table)

 CAUTION

First apply the inlet pressure p

e

 – then the outlet 

pressure p

a

.

The inlet pressure p

e

 must always be equal to or 

higher than the outlet pressure p

a

.

In the event of non-compliance with the sequence, 
the compensation diaphragm will reverse.

1. 

2.

p

e

p

a

2. 

1.

p

e

p

a

5

4

7

6

9

8

11

10

 12 

Relieve the outlet pressure p

a

.

 1 

Relieve the inlet pressure p

e

.

Отзывы: