12 Servicing
12.6 Replacing the ball bearing and screw set (inner bearing)
1
3
5
6
2
4
1
3
2
5
4
7
1.
Clamp the pump at the main screw. Ensure that the shaft is not damaged in the process.
2.
Size 15 – 660, 880
(figure left): Remove the socket screws
6
at the flange cover
5
.
Size 851, 951 – 3550
(figure right): Remove the socket screws
7
at the flange cover
5
.
3.
Lift the cartridge housing
1
of the flange cover. Hold the idle screws
3
in the process.
4.
Remove the idle screws.
2
3
9
8
2
5
10
11
12
14
13
15
2
5.
Take the bearing bush set
9
, consisting of bearing bush and segment washer (segment washer
only at
Size 15 – 660, 880
), off the idle screws and keep it for mounting.
6.
Size 15 – 660, 880, 2250 – 3550:
Remove the edge sealing rings
8
from the flange cover.
7.
Remove the flat gasket
11
at the flange cover.
8.
Remove the O-ring
10
from the flange cover and lift the flange cover from the main screw.
9.
Unclamp the main screw
2
, rotate it by 180° and clamp again.
10. Remove the circlip
15
and supporting ring
14
.
11. Use an extractor to pull the ball bearing
13
off the main screw.
12.
Size 15 – 660, 880:
Pull off the balancing cylinder
12
.
12.6.2
Installing the ball bearing and screw set
Personnel qualification:
o
Fitter
Personal protective equipment:
o
Work clothing
o
Protective gloves
o
Safety boots
Aids:
o
Mounting sleeve ball bearing
Operating instructions