Guideline 

Commissioning PLENTICORE plus inverter in 

combination with a BYD Battery-Box HV H5.1 - 

H11.5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This guide does not replace the operating instructions or manuals required for proper assembly and installation.

 

The trademarks, trade names, product descriptions and other designations used may be protected by law even without special 
designation (e.g. as trademarks). KOSTAL Solar Electric GmbH does not assume any liability or warranty for their free usability. 
Great care has been taken in the compilation of illustrations and texts. Nevertheless, errors cannot be excluded. The compilation 
is made without guarantee. Technical changes and errors excepted 

.  

 

 

 

Содержание BYD HV H11.5

Страница 1: ...and installation The trademarks trade names product descriptions and other designations used may be protected by law even without special designation e g as trademarks KOSTAL Solar Electric GmbH does...

Страница 2: ...or on the supply lines Refer to the relevant operating instructions for the respective devices inverter battery Install PLENTICORE plus inverter connect AC cables and control cables but DO NOT start u...

Страница 3: ...NTICORE plus or PIKO IQ inverters The KOSTAL Smart Energy Meter can be installed directly in the sub distribution cabinet and connected to the inverter without a PC adjustment of parameters and other...

Страница 4: ...BCU of the BYD Battery Box HV via WLAN Activating the WLAN on the computer Select the BYD battery from the list of devices in the WLAN network Enter the network key for the WIFI of the BYD battery acc...

Страница 5: ...st be entered Then click on the Next button Series Battery Counts Enter number of memory modules 4 to 9 Inverter Select inverter manufacturer KOSTAL Country Select your country e g Germany Finally cli...

Страница 6: ...he installation assistant appears in the inverter display Commissioning can be carried out completely via the display Simply follow the instructions on the display Alternatively the commissioning can...

Страница 7: ...Seite 7 12 DOC_Guide_PLENTIOCRE_BYD_ 2019 04 17 FW_1 20_EN All other settings can now be entered in the service menu Service menu Energy management Choice of energy meter and position of the sensor...

Страница 8: ...with the Energy Manager from B control the EM300 LR as well as with the KOSTAL Smart Energy Meter KSEM IMPORTANT The sensor Energy Manager Meter must be mounted in the Mains connection point position...

Страница 9: ...Seite 9 12 DOC_Guide_PLENTIOCRE_BYD_ 2019 04 17 FW_1 20_EN Service menu Battery settings All settings for the connected battery made here...

Страница 10: ...is available Download from our homepage Download and install the software for the PLENTICORE plus inverter that was released up to date at the time of installation This software can be downloaded fro...

Страница 11: ...EC 5095 The inverter cannot measure the battery voltage at DC input 3 With this message no voltage is detected at the DC3 input of the WR from the battery Is the battery on the circuit breaker switch...

Страница 12: ...h you will find a list of working combinations in the official Telekom Helps Community https telekomhilft telekom de t5 Fernsehen EntertainTV neu Liste funktionierender Kombinationen mit WLAN td p 186...