DRAFT
4. PERIODICAL MAINTENANCE PROCEDURE
Field Service
V
er. 1.0 Feb. 2010
16
bizhub C35
MAINTENANCE
4.2.3
Replacing the transfer belt unit
A. Periodically replaced parts/cycle
• Transfer belt unit: Every 100,000 counts
B. Replacing procedure
NOTE
Before replacing the transfer belt unit, be sure to perform the following items so that
the machine does not start to print jobs before the counter value of the transfer belt
unit is reset.
• Make sure that the machine does not have print jobs and fax reception data wait-
ing to print.
• Be sure to disconnect the USB cable, (the network cable, and the fax cable) from
the machine.
1.
Turn OFF the power switch.
2.
Remove the toner cartridge (C,M,Y,K).
3.
Remove the waste toner bottle.
4.
Remove the imaging unit (C,M,Y,K).
5.
Open the right door [1].
6.
Remove the top part [1] of the right
door.
A121F2C513DA
[1]
A121F2C514DA
[1]
Содержание bizhub C35
Страница 1: ...DRAFT SERVICE MANUAL 2010 02 2010 02 Ver 1 0 Ver 1 0 FIELD SERVICE ...
Страница 3: ...DRAFT ii Blank Page ...
Страница 28: ...DRAFT SERVICE MANUAL 2010 02 Ver 1 0 FIELD SERVICE Main body ...
Страница 135: ...DRAFT 7 OTHER MAINTENANCE ITEM Field Service Ver 1 0 Feb 2010 96 bizhub C35 MAINTENANCE Blank Page ...
Страница 227: ...DRAFT 11 FAX PROTOCOLS Field Service Ver 1 0 Feb 2010 188 ADJUSTMENT SETTING Blank Page ...
Страница 301: ...DRAFT 17 IC protector Field Service Ver 1 0 Feb 2010 262 Blank Page ...
Страница 314: ...DRAFT SERVICE MANUAL 2010 02 Ver 1 0 FIELD SERVICE Lower Feeder Unit PF P08 ...
Страница 317: ...DRAFT Lower Feeder Unit OUTLINE MAINTENANCE Field Service Ver 1 0 Feb 2010 ii Blank Page ...
Страница 319: ...DRAFT 1 PRODUCT SPECIFICATIONS Field Service Ver 1 0 Feb 2010 2 Lower Feeder Unit OUTLINE Blank Page ...