![Konica Minolta bizhub 25e Скачать руководство пользователя страница 292](http://html1.mh-extra.com/html/konica-minolta/bizhub-25e/bizhub-25e_field-engineering-manual_1993091292.webp)
5-42
ROLLER TRANSFER ASSY/GUIDE TRANSFER
1. Open the Cover jam access [1].
2. Insert a thin driver and lift up the right and left shaft of the Roller transfer assy [2].
3. Remove the Roller transfer assy [2].
>@
>@
4. Remove two Rollers gap [4] and one Gear 25H 0.6 [5] from the Roller transfer ASSY [3], then remove two
Brackets transfer F [6].
[4]
[6]
[3]
[6]
[4] [5]
Содержание bizhub 25e
Страница 1: ...bizhub 25e FIELD ENGINEERING MANUAL version 1 May 2013 DD1 91200 60 ...
Страница 2: ......
Страница 6: ...iv ...
Страница 48: ...1 42 ...
Страница 76: ...2 28 ...
Страница 153: ...3 77 First page of the report The resettable counter cleared date is printed with six figure of date month year ...
Страница 154: ...3 78 Second page of the report ...
Страница 155: ...3 79 Third page of the report ...
Страница 156: ...3 80 Fourth page of the report ...
Страница 200: ...3 124 ...
Страница 201: ...3 125 ...
Страница 254: ...5 4 5 2 1 URADF TRAY DOCUMENT 1 Pull and remove the TRAY DOCUMENT 2 from the Guide outer B up 1 ...
Страница 325: ...5 75 4 Install the ASSY SCRAPER 5 to the Drum unit 6 5 6 ...
Страница 353: ......