Supply conditions
Equipment responsibility
Upon receipt of the equipment the system owner or installation shipyard automatically
becomes fully responsible for the equipment, unless otherwise stated in the contract.
This responsibility covers the storage period before installation, the actual installation,
commissioning, and the period between the completion of the commissioning and the
acceptance of the equipment by the end user (normally the owner of the vessel or
platform into which the equipment is to be installed).
Reception, unpacking and storage
For more information, see:
.
Project management
Project manager
Kongsberg Maritime AS will normally appoint a dedicated project manager for the
delivery project. The project manager will follow up the installation and delivery, and
will be the installation shipyard’s and end user’s point of contact.
Installation performed by Kongsberg Maritime
Kongsberg Maritime AS will assist during the installation if specified in the contract
or requested by the installation shipyard or customer. Before any installation work
by Kongsberg Maritime AS can begin, all cables (at least those which are in any way
connected with the system) must be run and connected to their respective terminations.
These cables together with the transducer installation will then be checked by the
Kongsberg Maritime AS engineers before they are used.
Depending upon the availability of electrical power either from the generators on board
or from ashore, the equipment related to the system and the various parts of the system
will be tested during the Setting to Work (STW) period. This requires that interfaces to
equipment delivered by other subcontractors are ready for integration testing.
Delays may occur if any of the equipment related to the system is not available for
Kongsberg Maritime AS for testing. During sea trials, the vessel must be at Kongsberg
Maritime’s disposal when required, even though we cannot be held responsible for
expenses relating to the running costs of the vessel.
Содержание SBP 29
Страница 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Страница 57: ...451253 A 57 Cable plan overview Overview of the SBP 29 cable plan Cable layout and interconnections ...
Страница 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Страница 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Страница 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Страница 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Страница 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Страница 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Страница 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Страница 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Страница 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Страница 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Страница 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Страница 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Страница 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Страница 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Страница 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Страница 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Страница 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Страница 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Страница 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Страница 151: ......
Страница 152: ... 2019 Kongsberg Maritime ...