Requirements for insulation, heating and ventilation
The bulkheads in the sonar room should be insulated and provided with an interior wall
to the deck. The room should be equipped with heater and connected to the vessel's
ventilation system.
Heating requirements
Heating is an effective method for reducing humidity. The heater in the sonar room must
be dimensioned to maintain the equipment within its environmental tolerances.
Observe the environmental specifications related to the EM 2040 MKII units.
Ventilation requirements
The sonar room should be connected to the vessel's ventilation system to ensure a supply
of cooling air. If a ventilation system is not available, install two 3” pipes from the sonar
room to a suitable fresh air location on deck.
The fresh air should enter the room as close to the floor as possible, and should be
extracted from as high as possible. A funnel shaped drip-collector must be mounted
below the vent pipes to divert moisture to the bilge. On the main deck, the best
ventilation is provided when the outlet pipe is at least four meters higher than the inlet
pipe. To keep out sea water, rain and spray, the ventilation pipes must be fitted with
goosenecks or an equivalent design.
Note
If the vessel is likely to operate in tropical conditions, a suitable air conditioning system
must be installed. The air conditioning system must be able to provide an ambient
temperature that does not exceed the maximum operating temperatures of the EM 2040
MKII units that are installed in the room.
Requirements for electrical installations, cables and
communication
The electrical installations in the sonar room must meet minimum requirements to
provide suitable lights and supply power.
Light requirements
The sonar room must be equipped with suitable lighting to simplify the installation
and to aid future maintenance.
Communication requirements
The sonar room should be equipped with a telephone, an intercom system, or any other
means of oral communication between the sonar room and the bridge and/or control
room(s).
KONGSBERG EM 2040 MKII Installation Manual
Содержание EM 2040 MKII
Страница 8: ...8 472405 A KONGSBERG EM 2040 MKII...
Страница 92: ...92 472405 A Related topics List of cables page 101 KONGSBERG EM 2040 MKII Installation Manual...
Страница 107: ...472405 A 107 Related topics Cable plan Hydrographic Work Station page 100 Cable layout and interconnections...
Страница 177: ...472405 A 177 338208 RX transducer outline dimensions 0 7 degrees Drawing file...
Страница 178: ...178 472405 A 338207 TX transducer outline dimensions 0 7 degrees KONGSBERG EM 2040 MKII Installation Manual...
Страница 179: ...472405 A 179 337805 TX transducer outline dimensions 0 4 degrees Drawing file...
Страница 180: ...180 472405 A 353631 Transducer mounting plate 0 7 x 0 7 degrees KONGSBERG EM 2040 MKII Installation Manual...
Страница 181: ...472405 A 181 355913 Transducer mounting plate 0 4 x 0 7 degrees Drawing file...
Страница 182: ...182 472405 A 359252 Baffle plate 0 7 x 0 7 degrees KONGSBERG EM 2040 MKII Installation Manual...
Страница 183: ...472405 A 183 385422 Processing Unit dimensions Drawing file...
Страница 184: ...184 472405 A 424178 Portable Processing Unit dimensions KONGSBERG EM 2040 MKII Installation Manual...
Страница 185: ...472405 A 185 464618 HWS dimensions MC330 Rack model Drawing file...
Страница 186: ...186 472405 A 475694 HWS dimensions MC330 Desktop model KONGSBERG EM 2040 MKII Installation Manual...
Страница 187: ...472405 A 187 370275 Remote Control Unit K REM dimensions Drawing file...
Страница 188: ...188 472405 A 373962 Remote Control Unit K REM wiring diagram KONGSBERG EM 2040 MKII Installation Manual...
Страница 247: ......
Страница 248: ...2021 Kongsberg Maritime...