OPERATION
OPERATION
3-69
CHECK BEFORE STARTING
3
Perform the contents of this section before starting the work of each day.
CHECK MONITOR PANEL
1.
Turn the starting switch ON.
2.
Check that all the monitors, gauges, and the central warn-
ing lamp light up for approx. 3 seconds and the alarm
buzzer sounds for approx. 1 sec.
If the lamps do not light up, there is probably a failure or
disconnection. Contact your Komatsu distributor for inspec-
tion.
CHECK DUST INDICATOR
1.
If air cleaner clogging warning pilot lamps (left, right) (1) on
the maintenance monitor flash, clean the air cleaner ele-
ment.
For details of the method of cleaning, see “CLEANING OR
REPLACING OUTER ELEMENT (4-22)“.
REMARK
A dust indicator is installed inside the engine hood on the left
side of the machine. The dust indicator shows the condition of
clogging of the air cleaner in 5 stages. This makes it possible to
check how clean the element is and when it should be
replaced.
Содержание WA800-3E0
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2...
Страница 66: ...GENERAL VIEW OPERATION 3 4...
Страница 84: ...EXPLANATION OF COMPONENTS OPERATION 3 22 SWITCHES 3...
Страница 224: ...TROUBLESHOOTING OPERATION 3 162...
Страница 225: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 309: ...SPECIFICATIONS 15...
Страница 330: ...HANDLING MACHINES EQUIPPED WITH VHMS ATTACHMENTS OPTIONS 6 20...
Страница 331: ...INDEX 17...
Страница 332: ...INDEX 7 2...
Страница 335: ...COLOPHON 18...