5.1 Maintenance guide
Maintenance
WA70-7 – VENAM02003
5-5
5.1.2
Tipping down the operator's cab
1. Stick the lever into the pump. Set the lever at the pump to
“pump up” and pump the cab upward until it reaches the limit
stop.
2. Fold in the safety rod on the right side and secure it in the
folded position (arrow).
3. Set the lever to “pump down” and pump the cab downward
until the cylinder is entirely retracted (the resistance at the
lever increases markedly).
4. Remove the lever from the pump and fasten it to the radiator.
G0070267
G0070278
Содержание WA70-7
Страница 2: ......
Страница 3: ...Foreword WA70 7 VENAM02003 1 1 1 Foreword...
Страница 23: ...Foreword 1 5 Table of contents WA70 7 VENAM02003 1 21 Blank for technical reason...
Страница 28: ...1 7 Equipment Foreword 1 26 WA70 7 VENAM02003...
Страница 75: ...Operation WA70 7 VENAM02003 3 1 3 Operation...
Страница 114: ...3 2 Descriptions of the individual elements Operation 3 40 WA70 7 VENAM02003 Fuse allocation...
Страница 185: ...Troubleshooting WA70 7 VENAM02003 4 1 4 Troubleshooting...
Страница 203: ...Maintenance WA70 7 VENAM02003 5 1 5 Maintenance...
Страница 276: ...5 8 Maintenance procedure Maintenance every 2000 service hours Maintenance 5 74 WA70 7 VENAM02003...
Страница 277: ...Technical data WA70 7 VENAM02003 6 1 6 Technical data...
Страница 283: ...Special equipment attachments WA70 7 VENAM02003 7 1 7 Special equipment attachments...
Страница 291: ...Index WA70 7 VENAM02003 8 1 8 Index...
Страница 296: ...8 1 Index Index 8 6 WA70 7 VENAM02003...
Страница 297: ...Notes WA70 7 VENAM02003 9 1 9 Notes...
Страница 298: ...Notes 9 2 WA70 7 VENAM02003...
Страница 299: ...Notes WA70 7 VENAM02003 9 3...
Страница 300: ...Notes 9 4 WA70 7 VENAM02003...
Страница 301: ...Notes WA70 7 VENAM02003 9 5...
Страница 302: ...Notes 9 6 WA70 7 VENAM02003...