OPTIONS, ATTACHMENTS
ROTATING ARM
353
EVERY 500 HOURS SERVICE
Maintenance for every 100 and 250 hours service should be
carried out at the same time.
2. ARM ROTATION MACHINERY CASE
1.
Disconnect hoses (2), (5) and (6) from the swing motor.
2.
Plug the ends of the hoses and the ports in the motor.
3.
Remove 14 bolts (3 x4), (4 x2) then remove 8 bolts (1) from
the swing motor and lift off.
4.
Refill the greasebath with grease.
5.
Replace the swing motor an and tighten the 14 bolts
(Apply liquid gasket LG-6 to the mating faces and bolt holes).
6.
Reconnect the hoses (2), (5) and (6) to the swing motor.
EVERY 1000 HOURS SERVICE
Maintenance for every 250 and 500 hours service should be
carried out at the same time.
3. ARM ROTATION MACHINERY CASE
1.
Remove plug (1), drain the oil.
2.
Add 1.6 liters of SAE 90 Gear Oil through the plug hole.
3.
After adding the oil, check that it is at the specified level.
4.
Replace the plug and retighten.
* Tightening torque: 56 kg
1
2
3
4
5
6
1
Содержание PW160-7K Series
Страница 2: ......
Страница 3: ...3 FOREWORD ...
Страница 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Страница 20: ...20 ...
Страница 205: ...OPERATION TRANSPORTATION 205 Before moving off lock all machine cover and toolbox doors to prevent accidental opening ...
Страница 222: ...TROUBLESHOOTING OPERATION 222 ...
Страница 223: ...223 MAINTENANCE WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Страница 305: ...305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Страница 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Страница 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Страница 357: ......
Страница 358: ...PW160 7K WHEELED EXCAVATOR Form No UEAM003203 2005 KOMATSU All Rights Reserved Printed in Belgium 10 05 ...