![Komatsu PC490-11 Скачать руководство пользователя страница 380](http://html1.mh-extra.com/html/komatsu/pc490-11/pc490-11_installation-and-instruction-manual_1991269380.webp)
7.
Operate each cylinder 4 to 5 times to the end of its stroke to completely remove the air.
METHOD FOR BLEEDING AIR FROM SWING MOTOR
NOTICE
• When bleeding air, do not operate the swing.
• If the air is not bled from the swing motor, the motor bearings may be damaged.
1.
Run the engine at low idle, loosen hose (3) at port S, and
check that oil oozes out from port S hose (3).
2.
If oil does not ooze out, stop the engine, remove port S
hose (3), and fill the motor case with hydraulic oil.
When replacing the travel motor safety valve, ask your Komatsu distributor for the replacement and the air
bleeding.
METHOD FOR BLEEDING AIR FROM TRAVEL MOTOR
Bleed air only when the oil inside the travel motor case is drained.
1.
Run the engine at low idle, loosen air bleeder (4), and
tighten it when oil flows out.
2.
Run the engine at low idle and swing the upper structure
90 ° to bring the work equipment to the side of the track.
3.
Push up the machine until the track is raised slightly from the ground. Perform idle rotation of track for 2
minutes. Repeat this procedure on both the right and left sides.
REMARK
When rotating the track at idle, rotate equally both forward
and in reverse.
METHOD FOR BLEEDING AIR FROM ATTACHMENT (WHEN ATTACHMENT IS
EQUIPPED)
NOTICE
• If the method of air bleeding from the attachment is specified by the manufacturer, bleed the air ac-
cording to the specified procedure.
• After completing the air bleeding operation, stop the engine, and leave the machine for 5 minutes
before starting operations. This will remove the air bubbles in the oil inside the hydraulic tank.
MAINTENANCE PROCEDURE
MAINTENANCE
4-40
Содержание PC490-11
Страница 2: ......
Страница 25: ...LOCATION OF SAFETY LABELS a b c d e f g h KS000848 T T SAFETY SAFETY LABELS 2 5...
Страница 48: ...Map with mirror and rear view camera visibility aids fitted PRECAUTIONS FOR OPERATION SAFETY 2 28...
Страница 72: ......
Страница 73: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 340: ......
Страница 341: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 421: ...SPECIFICATIONS 5 1...
Страница 425: ...6 7m Boom PC490 11 SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 426: ...6 7m Boom PC490LC 11 SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 428: ...7 1m Boom PC490 11 SPECIFICATIONS SPECIFICATIONS 5 8...
Страница 429: ...7 1m Boom PC490LC 11 SPECIFICATIONS SPECIFICATIONS 5 9...
Страница 430: ......
Страница 474: ......
Страница 475: ...REPLACEMENT PARTS 7 1...
Страница 491: ......
Страница 492: ...PC490 11 PC490LC 11 HYDRAULIC EXCAVATOR Form No UENAM01105 2016 KOMATSU All Rights Reserved Printed in Belgium 11 2016...