MACHINE OPERATIONS AND CONTROLS
HIGH REACH DEMOLITION EQUIPMENT 27M
7-20
q
Do not pull in the crusher with the intermediate link and arm
pulled in.
The crusher will contact the boom and this may result in dam-
age to the machine.
PROHIBITION OF WORK AT THE STROKE END OF A CYLINDER
7
Do not use the attachment with the cylinder extended or retracted
all the way to its stroke end.
Leave some allowance at the stroke end when extending or
retracting the cylinder.
If the machine is operated with the bucket cylinder at the extract-
ing end, piston (1) strikes cylinder head (2). As a result, cylinder
head mounting bolt (3) may become loose and the cylinder piston
may come out eventually.
Confirmation and inspection before and after work.
Check the bolts of the bucket cylinder head for looseness. If any
bolts loosened, tighten them to the specified torque. If any bolts
have been removed, notify your Komatsu distributors.
INCORRECT
Matching of piston
and cylinder head
Cylinder stroke end
Содержание PC450-8
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Страница 267: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section ...
Страница 351: ...SPECIFICATIONS 15 ...
Страница 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Страница 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Страница 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Страница 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Страница 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Страница 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Страница 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Страница 469: ...INDEX 18 ...
Страница 470: ...INDEX 8 2 ...
Страница 473: ...COLOPHON 18 ...