SUPER LONG FRONT BOOM AND ARM
ATTACHMENTS ANDD OPTIONS
6-36
CHECKS BEFORE STARTING
6
To maximise safety when using the super long front machine and to identify any damage to the equipment early,
carry out the following checks before starting the machine:
q
Check daily for any loose nuts or bolts and tighten any that are found.
q
Check daily for any oil leakage.
q
Check all parts of the work equipment for any cracks, bending, buckling and play of the boom and arm. If any
abnormality is found, contact your Komatsu distributor immediately. Locations for checking are shown below:
USING SUPER LONG FRONT
6
WARNING
NEVER slew the machine if no work equipment is fitted.
WARNING
Take care when raising the work equipment to its highest point. Make sure the machine is in a stable con-
dition at all times.
Boom
Arm
Bucket
Bucket link
Содержание PC450-8
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Страница 267: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section ...
Страница 351: ...SPECIFICATIONS 15 ...
Страница 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Страница 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Страница 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Страница 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Страница 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Страница 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Страница 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Страница 469: ...INDEX 18 ...
Страница 470: ...INDEX 8 2 ...
Страница 473: ...COLOPHON 18 ...