
MAINTENANCE
MAINTENANCE SCHEDULE
4-17
MAINTENANCE SCHEDULE
4
If the machine is equipped with a hydraulic breaker, the maintenance schedule for some parts will be different.
For details, see “MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER (4-19)“ to confirm the correct main-
tenance schedule when carrying out maintenance.
MAINTENANCE SCHEDULE CHART
4
INITIAL 1000 HOURS MAINTENANCE (ONLY AFTER THE FIRST 1000 HOURS)
CHECK ENGINE VALVE CLEARANCE, ADJUST ........................................................................................... 4-79
4
WHEN REQUIRED
CHECK, CLEAN AND REPLACE AIR CREANER ELEMENT.......................................................................... 4-21
4
CLEAN INSIDE OF COOLING SYSTEM.......................................................................................................... 4-27
4
CHECK AND TIGHTEN TRACK SHOE BOLTS ............................................................................................... 4-30
4
CHECK AND ADJUST TRACK TENSION........................................................................................................ 4-31
4
REPLACE BUCKET TEETH (VERTICAL PIN TYPE)....................................................................................... 4-33
4
REPLACE BUCKET TEETH (HORIZONTAL PIN TYPE) ................................................................................. 4-36
4
REPLACE BUCKED SIDE CUTTER SHROUD................................................................................................ 4-38
4
ADJUST BUCKET CREARANCE ..................................................................................................................... 4-39
4
CHECK WINDOW WASHER FLUID LEVEL, ADD FLUID ............................................................................... 4-40
4
CHECK AND MAINTENANCE AIR CONDITIONER......................................................................................... 4-41
4
WASHING WASHABLE FLOOR....................................................................................................................... 4-42
4
CHECK GAS SPRING ...................................................................................................................................... 4-45
4
BLEEDING AIR FROM HYDRAULIC SYSTEM................................................................................................ 4-45
4
CHECKS BEFORE STARTING
EVERY 50 HOURS MAINTENANCE
LUBRICATING .................................................................................................................................................. 4-48
4
EVERY 250 HOURS MAINTENANCE
LUBRICATE SWING CIRCLE........................................................................................................................... 4-49
4
CHECK OIL LEVEL IN SWING MACHINERY CASE, ADD OIL ....................................................................... 4-65
4
CHECK OIL LEVEL IN FINAL DRIVE CASE, ADD OIL.................................................................................... 4-66
4
CHECK LEVEL OF BATTERY ELECTROLYTE............................................................................................... 4-50
4
CHECK FAN BELT, ALTERNATOR BELT TENSION, ADJUST ...................................................................... 4-52
4
CHECK AIR CONDITIONER COMPRESSOR BELT TENSION, ADJUST ...................................................... 4-53
4
EVERY 500 HOURS MAINTENANCE
LUBRICATING .................................................................................................................................................. 4-54
4
REPLACE FUEL PRE-FILTER CARTRIDGE ................................................................................................... 4-55
4
CHECK SWING PINION GREASE LEVEL, ADD GREASE ............................................................................. 4-58
4
CHANGE OIL IN ENGINE OIL PAN, REPLACE ENGINE OIL FILTER CARTRIDGE ..................................... 4-59
4
CLEAN AND INSPECT RADIATOR FINS, OIL COOLER FINS, AFTER COOLER
FIN AND CONDENSER FINS........................................................................................................................... 4-61
4
CLEAN AIR CONDITIONER FRESH/RECIRC FILTERS ................................................................................. 4-62
4
REPLACE BREATHER ELEMENT IN HYDRAULIC TANK.............................................................................. 4-64
4
Содержание PC450-8
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Страница 267: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section ...
Страница 351: ...SPECIFICATIONS 15 ...
Страница 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Страница 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Страница 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Страница 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Страница 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Страница 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Страница 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Страница 469: ...INDEX 18 ...
Страница 470: ...INDEX 8 2 ...
Страница 473: ...COLOPHON 18 ...