TRANSPORT AND STORAGE OF SUPER LONG FRONT MACHINE
NOTICE
• For transportation or storage, always use the support-
ing link (A) to secure the arm (B) and boom (C) as
shown. This will help to prevent excessive force bear-
ing on the boom and arm.
• Other precautions for transport and storage can be
found in "TRANSPORTATION PROCEDURE" of the
standard machine.
Procedure for installing link
Supporting link - weight 30kg.
1.
Lower the boom and extend the arm cylinder to set in the stow posture.
2.
When the arm cylinder is almost at the end of the stroke, lower the boom slowly to bring the bucket or buck-
et link into light contact with the ground.
3.
Remove the end of the supporting link (A) from the boom
(held by a pin (D) and snap ring (E)), then install it to the
arm with the pin (D) and snap ring (E). When doing this,
raise the boom slightly and retract the arm cylinder slightly
from the end of the stroke (5mm - 10mm) to align the holes
correctly.
4.
It is dangerous to carry out this operation with the arm
raised from the ground.
MAINTENANCE
SPECIAL SERVICE REQUIREMENTS FOR SUPER LONG FRONT WORK EQUIPMENT
k
k
CAUTION
When working in water or in wet sand, use molybdenum (LM-P) for the grease.
k
k
WARNING
NEVER slew the upper structure of a Super Long Front machine if the boom and arm have been re-
moved.
In addition to the standard service schedule, the following servicing should be carried out:
SERVICE ITEM
EVERY 50 HOURS SERVICE - see MAINTENANCE SECTION
LUBRICATING
1.
Arm and Link connection pin (1 place)
2.
Arm and Bucket connection pin (1 place)
3.
Link connection pins (2 places)
4.
Bucket cylinder rod pin (1 place)
5.
Bucket and Link connection pin (1 place)
CHECK EVERY 100 HOURS SERVICE - see MAINTENANCE SECTION
LUBRICATING
KS001083
KS001084
SUPER LONG FRONT BOOM AND ARM
ATTACHMENTS AND OPTIONS
6-32
Содержание PC360LC-11
Страница 2: ......
Страница 22: ......
Страница 49: ...Map with mirror and rear view camera visibility aids fitted SAFETY PRECAUTIONS FOR OPERATION 2 27 ...
Страница 76: ......
Страница 77: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 344: ......
Страница 345: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 425: ...SPECIFICATIONS 5 1 ...
Страница 429: ...PC360NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 430: ......
Страница 450: ...PC360LC 11 2 Piece Boom PC360NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 20 ...
Страница 457: ...ATTACHMENTS AND OPTIONS 17M LONG REACH BOOM AND ARM 6 27 ...
Страница 465: ...ATTACHMENTS AND OPTIONS SUPER LONG FRONT BOOM AND ARM 6 35 ...
Страница 499: ...REPLACEMENT PARTS 7 1 ...
Страница 515: ......