ATTACHMENTS AND OPTIONS
MACHINE READY FOR INSTALLATION OF ATTACHMENT
6–25
REMOVAL AND INSTALLATION OF ATTACHMENT
REMOVAL AND INSTALLATION OF ATTACHMENT:PC-L411-922K00A
REMOVAL
Removal:PC220-L411-520K00A
1. Lower the attachment to the ground and stop the engine.
2. Turn the starting switch to ON position (B), then set the lock
lever to FREE position (F).
3. After carrying out Step 2, operate each work equipment
control lever and attachment control pedal fully to the front,
rear, right, and left 2 to 3 times within 15 seconds to release
the internal pressure in the hydraulic circuit.
4. Set the lock lever to LOCK position (L).
5. Loosen slowly oil filler cap (F) on the top of the hydraulic
tank to release the internal pressure in the hydraulic circuit.
Содержание PC210-10 DEMOLITION BASE SPEC.
Страница 2: ......
Страница 14: ...PRODUCT INFORMATION FOREWORD 1 12...
Страница 75: ...OPERATION GENERAL VIEW 3 5...
Страница 159: ...OPERATION EXPLANATION OF COMPONENTS 3 89...
Страница 251: ...OPERATION MACHINE OPERATIONS AND CONTROLS 3 181...
Страница 332: ...MAINTENANCE SCHEDULE TABLE MAINTENANCE 4 22 26 Close engine hood 1...
Страница 392: ...END OF SERVICE LIFE MAINTENANCE 4 82...
Страница 393: ...SPECIFICATIONS 5 1 SPECIFICATIONS SPECIFICATIONS ALL 0000 001K04A SPECIFICATIONS...
Страница 397: ...SPECIFICATIONS SPECIFICATIONS 5 5 PC210 10...
Страница 398: ...SPECIFICATIONS SPECIFICATIONS 5 6 PC210LC 10...
Страница 444: ...RECOMMENDED ATTACHMENT OPERATIONS ATTACHMENTS AND OPTIONS 6 46...
Страница 445: ...REPLACEMENT PARTS 7 1 REPLACEMENT PARTS Replacement parts ALL 0000 001K16A REPLACEMENT PARTS...
Страница 453: ...8 1 INDEX...
Страница 457: ...COLOPHON 18...