TRANSPORTATION
OPERATION
3–212
q
Securing the machine when using tie-down point
Tie one end of each chain or wire rope of appropriate strength
to the tie-down holes on the track frame.
X : 50 mm minimum up to 100 mm.
(chain clearance to track)
NOTE: Do not use tie down lugs for towing.
q
Securing the machine when not using tie-down point
Place blocks under both ends of the tracks to prevent the
machine from moving during transportation, and secure the
machine with chains or wire rope of suitable strength. Be par-
ticularly careful to secure the machine in position so it does not
slip to the side.
STOW RADIO ANTENNA
STOW RADIO ANTENNA:PC-K861-822K01A
q
Loosen bolt (2) of radio antenna (1) at the rear of the cab,
turn the antenna to the lower side, then tighten bolt (2)
again to secure radio antenna (1) in position.
q
When unloading the machine from the trailer to operate, fol-
low the reverse procedure to the procedure for stowing to
set radio antenna (1) vertical, then secure it in position with
bolt (2).
Содержание PC210-10 DEMOLITION BASE SPEC.
Страница 2: ......
Страница 14: ...PRODUCT INFORMATION FOREWORD 1 12...
Страница 75: ...OPERATION GENERAL VIEW 3 5...
Страница 159: ...OPERATION EXPLANATION OF COMPONENTS 3 89...
Страница 251: ...OPERATION MACHINE OPERATIONS AND CONTROLS 3 181...
Страница 332: ...MAINTENANCE SCHEDULE TABLE MAINTENANCE 4 22 26 Close engine hood 1...
Страница 392: ...END OF SERVICE LIFE MAINTENANCE 4 82...
Страница 393: ...SPECIFICATIONS 5 1 SPECIFICATIONS SPECIFICATIONS ALL 0000 001K04A SPECIFICATIONS...
Страница 397: ...SPECIFICATIONS SPECIFICATIONS 5 5 PC210 10...
Страница 398: ...SPECIFICATIONS SPECIFICATIONS 5 6 PC210LC 10...
Страница 444: ...RECOMMENDED ATTACHMENT OPERATIONS ATTACHMENTS AND OPTIONS 6 46...
Страница 445: ...REPLACEMENT PARTS 7 1 REPLACEMENT PARTS Replacement parts ALL 0000 001K16A REPLACEMENT PARTS...
Страница 453: ...8 1 INDEX...
Страница 457: ...COLOPHON 18...