
OPERATION
MACHINE OPERATIONS AND CONTROLS
3–169
1. Turn fuel control dial (2) to the full speed (MAX) position
and hold it for three seconds.
2. When fuel control dial (2) is returned to the low idle (MIN)
position, the engine speed will drop.
HYDRAULIC SYSTEM WARM-UP OPERATION
HYDRAULIC SYSTEM WARM-UP OPERATION:PC220_KU-0000-13EK00A
k
WARNING
q
Before carrying out the warm-up operation for the
hydraulic equipment, turn the swing lock switch ON,
check on the monitor that the swing lock is actuated,
then start the warm-up operation.
q
When warming up the hydraulic equipment, check that
there is no person or obstacle in the surrounding area,
then sound the horn and start the operation.
q
Carry out the warm-up operation for the hydraulic
equipment until the hydraulic oil temperature monitor
displays the proper temperature. (When the hydraulic
oil temperature is low, the low temperature display
shown in the figure on the right is given.
Display (A) when temperature is proper: Monitor back-
ground (C) is blue
Display (B) when temperature is low: Monitor back-
ground (C) is white)
q
The warm-up operation for the hydraulic equipment is
necessary not only for the circuit between the pump
and cylinders and between the pump and motor, but
also for the control circuits. Do not carry out the opera-
tion just for one cylinder or motor, or the operation just
in one direction. Carry out the operation in all direc-
tions for all the work equipment (boom, arm and
bucket), swing, travel, and attachment (if equipped).
q
Before operating the travel lever, check the direction of
the track frame.
Содержание PC210-10 DEMOLITION BASE SPEC.
Страница 2: ......
Страница 14: ...PRODUCT INFORMATION FOREWORD 1 12...
Страница 75: ...OPERATION GENERAL VIEW 3 5...
Страница 159: ...OPERATION EXPLANATION OF COMPONENTS 3 89...
Страница 251: ...OPERATION MACHINE OPERATIONS AND CONTROLS 3 181...
Страница 332: ...MAINTENANCE SCHEDULE TABLE MAINTENANCE 4 22 26 Close engine hood 1...
Страница 392: ...END OF SERVICE LIFE MAINTENANCE 4 82...
Страница 393: ...SPECIFICATIONS 5 1 SPECIFICATIONS SPECIFICATIONS ALL 0000 001K04A SPECIFICATIONS...
Страница 397: ...SPECIFICATIONS SPECIFICATIONS 5 5 PC210 10...
Страница 398: ...SPECIFICATIONS SPECIFICATIONS 5 6 PC210LC 10...
Страница 444: ...RECOMMENDED ATTACHMENT OPERATIONS ATTACHMENTS AND OPTIONS 6 46...
Страница 445: ...REPLACEMENT PARTS 7 1 REPLACEMENT PARTS Replacement parts ALL 0000 001K16A REPLACEMENT PARTS...
Страница 453: ...8 1 INDEX...
Страница 457: ...COLOPHON 18...