
MAINTENANCE
MAINTENANCE PROCEDURE
4-85
EVERY 1000 HOURS MAINTENANCE
4
Maintenance for every 250 and 500 hours service should be carried out at the same time.
REPLACE FUEL MAIN FILTER CARTRIDGE
4
WARNING
q
After the engine has been operated, all parts are at high temperature, so do not replace the filter imme-
diately. Wait for all parts to cool down before starting the operation.
q
High pressure is generated inside the engine fuel piping system when the engine is running.
When replacing the filter, wait for at least 30 seconds after stopping the engine to let the internal pres-
sure go down before replacing the filter.
q
Do not bring any fire or flame close.
q
Be careful when opening the air bleed plug in the fuel filter head. It is still under pressure, so fuel may
spurt out.
NOTICE
q
Genuine Komatsu fuel filter cartridges use a special filter that has highly efficient filtering ability.
When replacing the filter cartridge, always use a genuine Komatsu part.
q
The common rail fuel injection system used on this machine consists of more precise parts than the
conventional injection pump and nozzle.
If any part other than a genuine Komatsu filter cartridge is used, dust or dirt may get in and cause
problems with the injection system. Always avoid using substitute parts.
q
When carrying out inspection or maintenance of the fuel system, pay more attention than normal to
the entry of dirt. If dirt is stuck to any part, use fuel to wash it off completely.
q
Container to catch the oil
q
Prepare a filter wrench
Содержание PC2000-8 BACKHOE
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Страница 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Страница 319: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the safety volume before reading this section...
Страница 411: ...MAINTENANCE MAINTENANCE PROCEDURE 4 93 2 Add a specified amount of power train oil from oil filler port F...
Страница 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Страница 419: ...MAINTENANCE MAINTENANCE PROCEDURE 4 101 q Boom A Important check points q Arm A Important check points...
Страница 433: ...SPECIFICATIONS 15...
Страница 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Страница 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 502: ...INDEX 8 6...
Страница 503: ...COLOPHON 19...
Страница 504: ...COLOPHON 9 2 PC2000 8 HYDRAULIC EXCAVATOR Form No EEAM029900 2010 KOMATSU All Rights Reserved Printed in Belgium 10 10...