SEN06128-00
30-102
16
PC200, 200LC, 220, 220LC-8M0
102 Testing and adjusting, Part 2
Special functions of machine monitor
a
Actions to take given by action levels to opera-
tor (Excerpt from the Operation and Mainte-
nance Manual)
Function of checking display of LCD (Liquid
Crystal Display)
While the standard screen is displayed, if the
numeral input switches or function switches are
operated in the following manner, the entire LCD
screen turns white.
q
Switch operations (simultaneous): [4] + [F2]
a
When finishing the operation of the switches,
release [F2] first.
a
If there is a display error in the LCD, only that
part is indicated in black.
a
To return to the former screen, press any one
of the function switches.
Reference: An LCD panel, as one of its characteris-
tics, sometimes shows black spots (spots that
remain unlit) and bright spots (spots that do not go
off).
If the number of the bright points and black points
does not exceed 10, the LCD panel is not faulty or
defective.
Function of checking service meter
When checking the service meter with the starting
switch in the OFF position, operate the numeral
input switches as follows to display only the service
meter section.
q
Switch operations (simultaneous): [4] + [1]
a
There is some time lag in start of the LCD, so
hold down the switches until the service meter
is displayed.
a
If you release one of the switches, the monitor
goes off.
Reference: After the machine monitor is used con-
tinuously over a long period of time, blue points
(points that remain lit) may appear on this screen. It
does not indicate that the LCD panel is faulty or
defective.
Degree
of emer-
gency
Action
level
Buzzer
Alarm
monitor
Remedy
High
L04
Q
(Con-
tinu-
ous)
Q
Stop immediately
and perform
checking and
maintenance.
Ask your Komatsu
distributor for test-
ing and repair ser-
vices.
I
L03
Q
(Inter-
mittent)
Q
Stop work, move
machine to safe
place, stop it, and
perform checking
and maintenance.
Ask your Komatsu
distributor for test-
ing and repair ser-
vices.
L02
Q
(Inter-
mittent)
Q
Stop work, and
then run the
engine at medium
speed with no
load, or stop it. If
the condition does
not improve, ask
your Komatsu dis-
tributor for testing
and repair ser-
vices.
Low
L01
(For 2
seconds
only)
—
Q
Some functions
are restricted, but
the machine can
work. After finish-
ing work, perform
checking and
maintenance.
Ask your Komatsu
distributor to per-
form testing or
repairs as neces-
sary.
Содержание PC200-8M0
Страница 2: ......
Страница 15: ...SEN06111 03 PC200 200LC 220 220LC 8M0 00 100 13 100 Index Table of contents...
Страница 87: ...SEN06117 00 PC200 200LC 220 220LC 8M0 10 200 3 200 Power train Power train...
Страница 88: ...SEN06117 00 10 200 4 PC200 200LC 220 220LC 8M0 200 Power train Final drive Final drive 1 PC200 8M0 PC200LC 8M0...
Страница 90: ...SEN06117 00 10 200 6 PC200 200LC 220 220LC 8M0 200 Power train Final drive PC220 8M0 PC220LC 8M0...
Страница 94: ...SEN06117 00 10 200 10 PC200 200LC 220 220LC 8M0 200 Power train Swing machinery PC220 8M0 PC220LC 8M0...
Страница 102: ...SEN06118 00 10 300 4 PC200 200LC 220 220LC 8M0 300 Undercarriage and frame Idler Idler 1...
Страница 109: ...SEN06118 00 PC200 200LC 220 220LC 8M0 10 300 11 300 Undercarriage and frame Track shoe...
Страница 115: ...SEN06119 00 PC200 200LC 220 220LC 8M0 10 401 3 401 Hydraulic system Part 1 Hydraulic equipment layout drawing...
Страница 117: ...SEN06119 00 PC200 200LC 220 220LC 8M0 10 401 5 401 Hydraulic system Part 1 Hydraulic tank and filter...
Страница 141: ...SEN06119 00 PC200 200LC 220 220LC 8M0 10 401 29 401 Hydraulic system Part 1 Pilot oil filter...
Страница 146: ...SEN06120 00 10 402 4 PC200 200LC 220 220LC 8M0 402 Hydraulic system Part 2 Control valve...
Страница 148: ...SEN06120 00 10 402 6 PC200 200LC 220 220LC 8M0 402 Hydraulic system Part 2 Control valve...
Страница 150: ...SEN06120 00 10 402 8 PC200 200LC 220 220LC 8M0 402 Hydraulic system Part 2 Control valve...
Страница 152: ...SEN06120 00 10 402 10 PC200 200LC 220 220LC 8M0 402 Hydraulic system Part 2 Control valve...
Страница 197: ...SEN06120 00 PC200 200LC 220 220LC 8M0 10 402 55 402 Hydraulic system Part 2 Functions and operation by valve...
Страница 201: ...SEN06121 00 PC200 200LC 220 220LC 8M0 10 403 3 403 Hydraulic system Part 3 Swing motor...
Страница 204: ...SEN06121 00 10 403 6 PC200 200LC 220 220LC 8M0 403 Hydraulic system Part 3 Swing motor...
Страница 211: ...SEN06121 00 PC200 200LC 220 220LC 8M0 10 403 13 403 Hydraulic system Part 3 Travel motor...
Страница 221: ...SEN06121 00 PC200 200LC 220 220LC 8M0 10 403 23 403 Hydraulic system Part 3 PPC valve...
Страница 237: ...SEN06121 00 PC200 200LC 220 220LC 8M0 10 403 39 403 Hydraulic system Part 3 PPC valve...
Страница 240: ...SEN06121 00 10 403 42 PC200 200LC 220 220LC 8M0 403 Hydraulic system Part 3 Valve control Valve control 1...
Страница 262: ...SEN06122 00 10 500 10 PC200 200LC 220 220LC 8M0 500 Work equipment Dimensions of arm Dimensions of arm 1...
Страница 264: ...SEN06122 00 10 500 12 PC200 200LC 220 220LC 8M0 500 Work equipment Dimensions of bucket Dimensions of bucket 1...
Страница 271: ...SEN06123 00 PC200 200LC 220 220LC 8M0 10 600 5 600 Electrical system Engine control...
Страница 272: ...SEN06123 00 10 600 6 PC200 200LC 220 220LC 8M0 600 Electrical system Engine control Engine controller...
Страница 279: ...SEN06123 00 PC200 200LC 220 220LC 8M0 10 600 13 600 Electrical system Electrical control system...
Страница 298: ...SEN06123 00 10 600 32 PC200 200LC 220 220LC 8M0 600 Electrical system Electrical control system 4 Pump controller...
Страница 305: ...SEN06123 00 PC200 200LC 220 220LC 8M0 10 600 39 600 Electrical system Machine monitor system...
Страница 325: ...SEN06123 00 PC200 200LC 220 220LC 8M0 10 600 59 600 Electrical system Sensor...
Страница 329: ...SEN06123 00 PC200 200LC 220 220LC 8M0 10 600 63 600 Electrical system KOMTRAX system...
Страница 413: ...SEN06127 00 PC200 200LC 220 220LC 8M0 30 101 61 101 Testing and adjusting Part 1 Adjusting mirrors Adjusting mirrors 1...
Страница 419: ...SEN06127 00 PC200 200LC 220 220LC 8M0 30 101 67 101 Testing and adjusting Part 1 Angle adjustment of rear view camera...
Страница 491: ...SEN06129 01 PC200 200LC 220 220LC 8M0 30 103 19 103 Testing and adjusting Part 3 Pm Clinic service...
Страница 503: ...Fuse locations SEN06131 00 PC200 200LC 220 220LC 8M0 40 100 11 100 Failure code table and fuse locations...
Страница 523: ...SEN06132 01 PC200 200LC 220 220LC 8M0 40 200 19 200 General Information on troubleshooting Connector list and layout 2 6...
Страница 524: ...200 General Information on troubleshooting Connector list and layout 40 200 20 PC200 200LC 220 220LC 8M0 SEN06132 01 3 6...
Страница 525: ...SEN06132 01 PC200 200LC 220 220LC 8M0 40 200 21 200 General Information on troubleshooting Connector list and layout 4 6...
Страница 526: ...200 General Information on troubleshooting Connector list and layout 40 200 22 PC200 200LC 220 220LC 8M0 SEN06132 01 5 6...
Страница 527: ...SEN06132 01 PC200 200LC 220 220LC 8M0 40 200 23 200 General Information on troubleshooting Connector list and layout 6 6...
Страница 623: ...SEN06134 00 PC200 200LC 220 220LC 8M0 40 302 3 302 Troubleshooting by failure code Part 2...
Страница 679: ...SEN06135 00 PC200 200LC 220 220LC 8M0 40 303 3 303 Troubleshooting by failure code Part 3...
Страница 727: ...SEN06136 00 PC200 200LC 220 220LC 8M0 40 304 3 304 Troubleshooting by failure code Part 4...
Страница 775: ...SEN06137 00 PC200 200LC 220 220LC 8M0 40 305 3 305 Troubleshooting by failure code Part 5...
Страница 825: ...SEN06138 00 PC200 200LC 220 220LC 8M0 40 400 3 400 Troubleshooting of electrical system E mode...
Страница 883: ...SEN06139 00 PC200 200LC 220 220LC 8M0 40 500 3 500 Troubleshooting of hydraulic and mechanical system H mode...
Страница 1051: ...SEN06144 00 PC200 200LC 220 220LC 8M0 50 300 35 300 Power train Removal and installation of swing circle assembly...
Страница 1091: ...SEN06146 00 PC200 200LC 220 220LC 8M0 50 500 17 500 Hydraulic system Disassembly and assembly of control valve...
Страница 1109: ...SEN06146 00 PC200 200LC 220 220LC 8M0 50 500 35 500 Hydraulic system Disassembly and assembly of work equipment cylinder...
Страница 1115: ...SEN06147 00 PC200 200LC 220 220LC 8M0 50 600 5 600 Work equipment Removal and installation of work equipment assembly...
Страница 1157: ...SEN06149 00 PC200 200LC 220 220LC 8M0 50 800 9 800 Electrical system Removal and installation of KOMTRAX terminal assembly...
Страница 1162: ...100 Air conditioner Air conditioner component 80 100 4 PC200 200LC 220 220LC 8M0 SEN06151 00 Air conditioner component...
Страница 1177: ...SEN06151 00 PC200 200LC 220 220LC 8M0 80 100 19 100 Air conditioner Sensor...
Страница 1197: ...SEN06151 00 PC200 200LC 220 220LC 8M0 80 100 39 100 Air conditioner Troubleshooting chart 1 2 Heating trouble...
Страница 1228: ...100 Air conditioner Connection of service tool 80 100 70 PC200 200LC 220 220LC 8M0 SEN06151 00 A From Cab B To Condenser...
Страница 1235: ...SEN06151 00 PC200 200LC 220 220LC 8M0 80 100 77 100 Air conditioner Desiccant replacement procedure...
Страница 1239: ...SEN06153 00 PC200 200LC 220 220LC 8M0 90 100 3 100 Hydraulic diagrams and drawings Symbols in hydraulic circuit diagram...
Страница 1240: ...SEN06153 00 90 100 4 PC200 200LC 220 220LC 8M0 100 Hydraulic diagrams and drawings Symbols in hydraulic circuit diagram...
Страница 1242: ...SEN06153 00 PC200 200LC 220 220LC 8M0 90 100 7 100 Hydraulic diagrams and drawings Symbols in hydraulic circuit diagram...
Страница 1246: ...SEN06154 00 PC200 200LC 220 220LC 8M0 90 200 3 200 Electrical diagrams and drawings Symbols in electric circuit diagram...
Страница 1247: ...SEN06154 00 90 200 4 PC200 200LC 220 220LC 8M0 200 Electrical diagrams and drawings Symbols in electric circuit diagram...
Страница 1253: ...SEN06154 00 PC200 200LC 220 220LC 8M0 90 200 5 200 Electrical diagrams and drawings Symbols in electric circuit diagram 15...