METHOD FOR CHANGE OIL IN SWING MACHINERY CASE
k
k
WARNING
Immediately after the engine is stopped, its parts and oil are still very hot, and may cause burn injury.
Wait for the temperature to go down, and then start the work.
Refill capacity: 40.0 ℓ(20.0 ℓ x 2 pieces)
1.
Place a container under drain nipple (1) to receive the oil.
2.
Loosen the drain valve (P) at the bottom of the machine,
drain the oil, then tighten the drain valve again.
MAINTENANCE
MAINTENANCE PROCEDURE
4-55
Содержание PC1250-11
Страница 2: ......
Страница 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Страница 24: ......
Страница 66: ......
Страница 67: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 73: ...REMARK The above figure does not show all of the caution lamp symbols OPERATION GENERAL VIEW 3 7...
Страница 317: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 377: ...Boom d Left side e Right side f Head side g Foot side MAINTENANCE MAINTENANCE PROCEDURE 4 61...
Страница 378: ...Arm h Left side i Right side MAINTENANCE PROCEDURE MAINTENANCE 4 62...
Страница 400: ......
Страница 401: ...SPECIFICATIONS 5 1...
Страница 406: ......
Страница 435: ...REPLACEMENT PARTS 7 1...
Страница 444: ......
Страница 452: ...PC1250 11 PC1250SP 11 HYDRAULIC EXCAVATOR Form No EENAM03651 2018 KOMATSU All Rights Reserved Printed in Belgium 06 2018...