Items to be prepared
Grease pump
1.
Park the machine on a level and firm ground, lower the
work equipment to the ground in the posture shown in the
figure, and stop the engine.
2.
By using a grease pump, pump in grease through the grease fittings shown by arrows.
(1) Arm-Link connection pin (1 place)
(2) Arm and bucket connection pin (1 place)
(3) Link connection pin (2 places)
(4) Bucket cylinder rod end pin (1 place)
(5) Bucket and link connection pin (1 place)
3.
After greasing, wipe off any old grease that is pushed out.
EVERY 250 HOURS MAINTENANCE
Maintenance for every 50 hours service should be performed at the same time.
METHOD FOR CHECKING BATTERY ELECTROLYTE LEVEL
Perform this procedure before operating the machine.
Inspect the battery electrolyte level according to the standard at least once a month.
MAINTENANCE
MAINTENANCE PROCEDURE
4-47
Содержание HB365LC-3
Страница 2: ......
Страница 25: ...LOCATION OF SAFETY LABELS 5 SAFETY SAFETY LABELS 2 5...
Страница 73: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 348: ......
Страница 349: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 436: ......
Страница 437: ...SPECIFICATIONS 5 1...
Страница 441: ...HB365LC 3 SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 442: ...HB365NLC 3 SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 489: ...REPLACEMENT PARTS 7 1...
Страница 505: ......
Страница 506: ...HB365LC 3 HYDRAULIC EXCAVATOR Form No UENAM01292 2017 KOMATSU All Rights Reserved Printed in Belgium 02 2017...