1.
Set the work equipment on the level and firm ground in the
maintenance posture as shown in the figure, then lower it
to the ground and stop the engine.
2.
By using a grease pump, pump in grease through the grease fitting shown by arrow.
(1) Boom cylinder foot pin (2 places)
(2) Boom foot pin (2 places)
(3) Boom cylinder rod end (2 places)
(4) Arm cylinder foot pin (1 place)
(5) Boom and arm connection pin (1 place)
(6) Arm cylinder rod end (1 place)
(7) Bucket cylinder foot pin (1 place)
3.
After greasing, wipe off any old grease that is pushed out.
METHOD FOR CHANGING OIL IN ENGINE OIL PAN, REPLACING ENGINE OIL
FILTER CARTRIDGE
k
k
WARNING
Immediately after the engine is stopped, its parts and oil are still very hot, and may cause burn injury.
Wait for the temperature to go down, and then start the work.
Refill capacity of oil pan18 ℓ
MAINTENANCE
MAINTENANCE PROCEDURE
4-49
Содержание HB215LC-3
Страница 2: ......
Страница 11: ...Do not jump down from the cab or machine Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVEL 1 9...
Страница 24: ......
Страница 27: ...LOCATION OF SAFETY LABELS SAFETY SAFETY LABELS 2 3...
Страница 72: ......
Страница 73: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 344: ......
Страница 345: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 359: ...Fuel main fil ter cartridge Replace Replace Replace Replace MAINTENANCE MAINTENANCE SCHEDULE 4 15...
Страница 431: ...SPECIFICATIONS 5 1...
Страница 474: ......
Страница 475: ...REPLACEMENT PARTS 7 1...
Страница 482: ......
Страница 491: ......
Страница 492: ...HB215LC 3 HYDRAULIC EXCAVATOR Form No UENAM01522 2019 KOMATSU All Rights Reserved Printed in Belgium 02 2019...