CHECKING AUTO-GREASING AND OPERATION METHOD FOR FILLING
GREASE
NOTICE
• Fill in only clean grease by using a suitable tool (A).
Soiled lubricant leads to serious system trouble.
• If the grease tank is emptied below “min” mark, the air
bleeding of whole system must be performed.
To bleed air from the auto-greasing system, consult
your Komatsu distributor.
Maintenance work should be performed if needed or every 50
hours.
If any problem occurs, consult your Komatsu distributor.
Prepare the grease.
For the types of grease, see “METHOD FOR USING FUEL,
COOLANT AND LUBRICANTS ACCORDING TO AMBIENT
TEMPERATURE”.
• Check the general control function according to the following procedure.
1.
Actuate the manual greasing.
2.
Check the function of the control unit and system components.
• Check the system components for leakage and damage.
Perform the check periodically.
• Check the bearings visually.
Check that the bearings have been lubricated properly.
• Before reaching “min” mark, refill the grease tank with grease to “max” mark.
The grease amount between the marks “min” and “max” is approximately 1.6 ℓ.
By the factory settings, one filling is enough to use for at least 50 hours.
If the lubrication settings have been changed or some additional lubrications have been performed, check
the grease level earlier.
Depending on the machine equipment, there are following possibilities to refill the grease tank.
(1) Taper type grease nipple
(2) Filling port
The fittings must be free of dirt.
The transparent grease tank allows visual fill level control.
ATTACHMENTS AND OPTIONS
AUTO-GREASING
6-23
Содержание H75051
Страница 2: ... ...
Страница 27: ...LOCATION OF SAFETY LABELS SAFETY SAFETY LABELS 2 5 ...
Страница 66: ......
Страница 67: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 74: ...Outside of cab 1 Slow blow fuse 2 Frame lock bar GENERAL VIEW OPERATION 3 8 ...
Страница 158: ...SWITCHES g0032100 1 ECSS switch 2 Front working lamp switch EXPLANATION OF COMPONENTS OPERATION 3 92 ...
Страница 289: ...Securing position Fixing angle A 69 B 59 C 33 D 46 Expected trailer width E 2990 mm OPERATION TRANSPORTATION 3 223 ...
Страница 310: ......
Страница 311: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 396: ......
Страница 397: ...SPECIFICATIONS 5 1 ...
Страница 399: ... 1 Value when bucket dump angle is 45 B I A G E H F D C 9 J W0 1 4 5 6 SPECIFICATIONS SPECIFICATIONS 5 3 ...
Страница 400: ......
Страница 424: ......
Страница 425: ...REPLACEMENT PARTS 7 1 ...
Страница 440: ...WA270 8 WHEEL LOADER Form No VENAM31500 2016 KOMATSU Hanomag GmbH All Rights Reserved Printed in Europe 12 2016 ...