OPERATION
MACHINE OPERATIONS AND CONTROLS
3-101
q
Boom operation RAISE (E)
←→
LOWER (F)
q
Arm operation IN (B)
←→
OUT (A)
q
Bucket operation CURL (D)
←→
DUMP (C)
When carrying out swing operations, release swing lock switch
(2), check that swing lock monitor (18) goes out, then operate
the swing.
q
Swing operation Left (G)
←→
Right (H)
q
Travel (Lo) operation FORWARD (A)
←→
REVERSE (B)
18. Check that hydraulic oil temperature monitor (7) is display-
ing green.
If the hydraulic oil temperature monitor is not displaying
green (it is displaying white), repeat Steps 6 to 10 until the
display is green.
If the hydraulic oil temperature monitor displays green, the hydraulic equipment warm-up operation is completed.
After confirming that the hydraulic oil temperature monitor displays green, carry out the following procedure.
Содержание Galeo PC800LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 16: ...PRODUCT INFORMATION FOREWORD 1 14 ...
Страница 24: ...CONTENTS 1 22 ...
Страница 29: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Страница 64: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 40 ...
Страница 220: ...TROUBLES AND ACTIONS OPERATION 3 156 ...
Страница 221: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section ...
Страница 287: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 A Important check points F Front q Revolving frame q Center frame ...
Страница 301: ...SPECIFICATIONS 15 ...
Страница 304: ...SPECIFICATIONS SPECIFICATIONS 5 4 ...
Страница 313: ...INDEX 17 ...
Страница 314: ...INDEX 7 2 ...
Страница 317: ...COLOPHON 18 ...