![Komatsu D155AX-8E0 Скачать руководство пользователя страница 367](http://html1.mh-extra.com/html/komatsu/d155ax-8e0/d155ax-8e0_operation-and-maintenance-manual_1991326367.webp)
METHOD FOR REPLACING ELEMENT ON POWER TRAIN OIL FILTER
1.
Remove bolts (1).
2.
Remove cover (2).
3.
Remove mounting bolts (4) of filter (3), and remove cover
(5).
4.
Remove the element.
5.
Clean the inside of the case and the removed parts, then
install the new element.
Komatsu recommends using Komatsu genuine elements.
6.
Install cover (2).
7.
Tighten bolt (1).
METHOD FOR REPLACING AIR CONDITIONER FRESH/RECIRC FILTERS
Since the filtering ability of the filters decreases as they are aged, replace them every 500 operating hours or
every year.
METHOD FOR REPLACING RECIRCULATION AIR FILTER
1.
Remove knob (1) at the rear left in the cab, and remove
bracket (2) from portion (a).
2.
Remove the recirculation air filter from bracket (2).
3.
Replace the recirculation air filter with a new one, taking
care of its installed direction.
4.
Install bracket (2), while matching it to portion (a), and in-
stall the knob.
MAINTENANCE
MAINTENANCE PROCEDURE
4-55
Содержание D155AX-8E0
Страница 2: ......
Страница 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Страница 13: ...Evaluation height 1 2m above the ground Scale interval of the circles is 1 m FOREWORD INTRODUCTION 1 11...
Страница 24: ......
Страница 63: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 312: ......
Страница 313: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 397: ...SPECIFICATIONS 5 1...
Страница 403: ...HANDLE HEADREST Keep the headrest inserted to the end ATTACHMENTS AND OPTIONS HANDLE HEADREST 6 5...
Страница 404: ......
Страница 405: ...REPLACEMENT PARTS 7 1...
Страница 420: ...D155AX 8E0 BULLDOZER Form No EENAM03780 2019 KOMATSU All Rights Reserved Printed in Belgium 04 2019...