METHOD FOR SETTING AUTOMATIC TOPO SURVEY (DISTANCE BASED)
METHOD FOR SETTING LAYERS
Tap “Project layer for Topo:” column, and select the layer to
which the Topo survey point is saved.
METHOD FOR SETTING LOGGING POINT
Tap “Log at:” column, and select the bucket edge position for
which Topo survey is performed.
“Bucket:Left”: Bucket edge at left end
“Bucket:Middle”: Bucket edge at center
“Bucket:Right”: Bucket edge at right end
“Left and Right Edge”: Bucket edge at both ends
METHOD FOR SETTING AUTO-TOPO (MINIMUM HORZ. DISTANCE)
To perform the automatic Topo survey (minimum horizontal dis-
tance), tap “Auto-Topo:” column, and select “Minimum horz.
distance”.
Coordinates of the bucket edge can be saved continuously
each time when the work equipment moves the set distance.
SETTING
CONTROL BOX
7-135
Содержание A31001
Страница 12: ...LOCATION OF SAFETY LABELS Options are shown with marks in the figure SAFETY LABELS SAFETY 2 4...
Страница 103: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 106: ......
Страница 107: ...SPECIFICATIONS 5 1...
Страница 110: ......
Страница 111: ...ATTACHMENTS AND OPTIONS Please read and make sure that you understand the SAFETY section before reading this section 6 1...
Страница 116: ......
Страница 117: ...SETTING 7 1...
Страница 311: ...EXECUTIONS 8 1...
Страница 376: ...PC360LCi 11 PC390LCi 11 HYDRAULIC EXCAVATOR Form No CEAM032703...