15.2
Guide for setup
The procedure for setup is described as an example. A different method may be appro-
priate or necessary, depending on the application of the equipment.
—
Check the assembly and orientation of the motor.
—
Check the drive components (clutch, gear unit, belt pulley) for the correct seating
and setting (observe the permissible radial and axial forces).
—
Check the wiring and connections to the drive. Check that the earthing is correct.
—
Test the function of the holding brake, if used (apply 24V, brake must be released).
—
Check whether the rotor of the motor revolves freely (release the brake, if necessa-
ry). Listen out for grinding noises.
—
Check that all the required measures against accidental contact with live and moving
parts have been carried out.
—
Carry out any further tests which are specifically required for your system based on
the risc assessment.
—
Now commission the drive according to the AKD setup instructions.
—
In multi-axis systems, individually commission each drive unit (drive and motor).
English - 52
Servomotors AKMH
Setup
08/2013
Kollmorgen
ENGLISH
Содержание AKMH
Страница 6: ...Diese Seite wurde bewusst leer gelassen Deutsch 6 Servomotoren AKMH 08 2013 Kollmorgen DEUTSCH...
Страница 61: ...This page has been deliberately left blank Servomotors AKMH General 61 Kollmorgen 08 2013 Technical Data...
Страница 64: ...18 4 Dimensions AKMH3 Ax flanges General 64 Servomotors AKMH Dimension drawings 08 2013 Kollmorgen...
Страница 66: ...18 7 Dimensions AKMH4 Ax flanges General 66 Servomotors AKMH Dimension drawings 08 2013 Kollmorgen...
Страница 68: ...18 10 Dimensions AKMH5 Ax flanges General 68 Servomotors AKMH Dimension drawings 08 2013 Kollmorgen...
Страница 70: ...18 13 Dimensions AKMH6 Ax flanges General 70 Servomotors AKMH Dimension drawings 08 2013 Kollmorgen...
Страница 72: ...This page has been deliberately left blank General 72 Servomotors AKMH Dimension drawings 08 2013 Kollmorgen...