background image

13-1

528437

INSTALLATION INSTRUCTIONS

L

8mm

PIVOT DOOR, L-SHAPE, 8mm

K-37467T

STANCE

-1-

, 2010

Copyright Kohler China Ltd., 2010

BEFORE YOU BEGIN

BEFORE YOU BEGIN

·

·

·

·

·

·

3

(

)

50~80mm

3mm/m

·

·

·

·

·

·

Before you install your shower door, please read
these instructions carefully to familiarize yourself
with the required tools, materials, and installation
sequences. Follow the sections that pertain to your
particular installation. This will help you avoid costly
mistakes. In addition to proper installation, read all
operating and safety instructions.
All information is based on the latest product
information available at the time of publication.
Kohler China Ltd. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
These instructions contain important care, cleaning,
and warranty information-

Make sure that the bath and the finished wall
material are completely and correctly installed prior
to installing your shower door. Prepare waterproof
layer to wall and floor of the showering area. It is not
allowed for any presence of electric switches and
sockets. Make sure the floor drain runs smoothly.
Before starting the door installation, lay out and
identify all the parts. Use the exploded view
illustrated on page 3 for reference.
For the installation method of customized shower
with different dimensions, please refer to this
instructions.

Tempered glass cannot be cut, drilled or
knocked by hard object. Make sure corner area
of the glass refraining from knocking so as to
cause personal injury due to broken glass.

Please install this door on Kohler

receptors or curbs. (Not included). If the curb is not
Kohler-branded, please note its top width should fall
within the range of 50~80mm.

The shower door requires a flat vertical

finished wall. The squareness of the wall is
recommended no more than 3 mm/m. KOHLER
Company won t take responsibility of the installation
quality.

please leave these

instructions for the consumer.

CAUTION: Risk of injury or product damage.

ATTENTION:

IMPORTANT:

1161742-T01-A

Содержание STANCE K-37467T

Страница 1: ...nstalled prior to installing your shower door Prepare waterproof layer to wall and floor of the showering area It is not allowed for any presence of electric switches and sockets Make sure the floor drain runs smoothly Before starting the door installation lay out and identify all the parts Use the exploded view illustrated on page 3 for reference For the installation method of customized shower w...

Страница 2: ...nnel for the side panel is delivered to the door assembly Remove the panel wall channel before installing the door but do not remove the transit blocks Before installation check that all components are correctly supplied If any parts are missing please ring the helpline PARTS IDENTIFICATION PARTS IDENTIFICATION 1161742 T01 A ...

Страница 3: ...ant Tools Required 6mm INSTALLATION REQUIREMENTS INSTALLATION REQUIREMENTS Side Seal Side Panel Return Panel Assy Cover Strip Edge Strip Top Frame Wall Frame Magnetic Strip Wall Jamb Bottom Frame Door Glass Pivot Caver Bottom Pivot Caver Top Handle Assy Glass Shelf X2 Pivot Pin X2 Cover Cap Frame Cap Bottom X4 Frame Cap Top X8 4mm Allen Key 4mm X6 Cover X6 X10 X6 X4 1161742 T01 A ...

Страница 4: ...e tray on both sides 20mm STEP 1 IMPORTANT MUST Tray be level along front edge NOTE LH version shown RH fitting is a mirror image of these instructions IMPORTANT Tray must be level in all planes or door will not install properly 0mm 20 6mm RETURN SIDE Mark the wall 20mm in from the front edge of the tray on both sides 20mm 1161742 T01 A ...

Страница 5: ...ept vertical must 0mm 6mm The side of the wall frame with hole shall face inside Note Frames raised shall face outside Note Fix both top and bottom frame to the side wall frame Insert the frame into the wall jamb Insert the return panel assy into the wall jamb 1161742 T01 A ...

Страница 6: ...STEP 9 Please first insert the glass into the top frame and then into the bottom frame Please insert the glass in the correct direction the end with the hole shall be close to the top frame and the labeled side with arrows on the label shall be against the wall 1161742 T01 A ...

Страница 7: ... Lift the door into place Insert the pin into the base and then insert the glass door IMPORTANT Ensure the door is fully supported at all times Note Please make sure that there should be inserts with correct directions at both these two places 1161742 T01 A ...

Страница 8: ... both into the base and the body Then tighten the glass and the pivot pin assembly Note The pivot pin assembly should be vertical after being tightened Push the wall frames at both sides to make the gap even between the glass and the top and bottom frames Install the handle 8 1161742 T01 A ...

Страница 9: ... Fix the magnetic strips onto the door glass and the wall frames When the door is closed the magnetic strips should touch along their length Install the edge strip to fix the side panel Fix the glass and the top frame Then insert the side seal into the wall frame 1161742 T01 A ...

Страница 10: ... Ensure the accessory is positioned in a horizontal way 6mm Note Ensure the accessory is positioned in a horizontal way STEP 21 Line then fix the bracket base STEP 22 Fix the glass bracket STEP 23 10 Insert the cover seal to the top frame 1161742 T01 A ...

Страница 11: ...11 STEP 24 Insert the bottom seal to the door glass STEP 25 Install the cover strip STEP 26 Install the pivot pin and other cover caps STEP 27 Install the frame cap of top and bottom frame 1161742 T01 A ...

Страница 12: ...STEP 29 Do not use the enclosure for at least 24 hours 24 24hrs 12 Lay a thin bead of sealant between the wall channel and the bottom frame STEP 28 1161742 T01 A ...

Отзывы: