3. Supply Connections
Ground joint: slip coupling nut onto supply tube.
Carefully position round end of supply tube squarely to inlet of
faucet or bubbler shank and supply stop.
Tighten all nuts.
4. Installation Checkout
Turn on the main water supply and check for leaks. Repair as
needed.
Turn on hot and cold faucet handles and run water for about a
minute to remove debris.
Turn faucet handles off.
Shank
Coupling
Nut
Supply
Tube
Supply
Stop
Kohler Co.
5
105218-2-AB
Содержание K-7500
Страница 14: ...105218 2 AB ...
Страница 15: ...105218 2 AB ...
Страница 16: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 México 001 877 680 1310 kohler com 2004 Kohler Co 105218 2 AB ...