background image

1

ã

, 2004

Copyright Kohler China Ltd., 2004

368

201419

C

1036303-T01-B

A. Summary Of Key Requirements

Observe all local plumbing codes.
Install the unit to a level subfloor.
Provide properly-dimensioned framing.

!

!

!

!

Baths are designed for a variety of installations,
depending upon the model chosen.

A.

!

!

!

!

B. Product Inspection

Uncrate and inspect bath for damage. Leave all
materials in carton during construction to prevent
damage.

B.

BEFORE YOU BEGIN

BEFORE YOU BEGIN

ACRYLIC BATH

INSTALLATION INSTRUCTIONS

K-18778T

EMERALD

·

·

·

Please read these instructions carefully to
familiarize yourself with the required tools, materials,
and installation sequences. Follow the sections that
pertain to your particular installation. This will help
you avoid costly mistakes. In addition to proper
installation, read all operating and safety instructions.
All information is based on the latest product
information available at the time of publication.
Kohler China Ltd. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
These instructions contain important care, cleaning,
and warranty information-

please leave these

instructions for the consumer.

·

·

·

·

·

·

·

PRODUCT REQUIREMENTS

PRODUCT REQUIREMENTS

/

17295T-CP

ROUGHING-IN

A.

:

Accessories/Hardware:

Drain

A.Ordering Information:

17295T-CP

Optional

Содержание K-18778T

Страница 1: ...iliarize yourself with the required tools materials and installation sequences Follow the sections that pertain to your particular installation This will help you avoid costly mistakes In addition to...

Страница 2: ...uired A Tools Required B A Adjustable pipe wrench Rule Level Safety shoes Safety glasses Square Pliers Utility knife Plumbers putty Wall coverings as necessary Silicone sealant Gypsum ciment optional...

Страница 3: ...allation The suggested framing construction is illustrated 1 16 2mm Gap Between Bath Rim and Framing 2 Bath Rim Framing Construction Finished Wall Wall D D Plumbing Preparation Position the plumbing a...

Страница 4: ...carefully protect its surface during installation 2a 1305 700 1305 1 4 1 9 2b Whirlpool must be installed level on all top edges 2b IMPORTANT 1036303 T01 B 3 A 3 Fit timber batten supports or check in...

Страница 5: ...Silicone Sealant Tiling Bead Brick Rebated Into Wall Ng Silicone Sealant 50 25mm Timber Batten Paste Mortar Tile Packed Out From Wall Paste Mortar Tile Brick Under Flange Tiling Ng Silicone Sealant T...

Страница 6: ...ized electrician Please refer to Spa Pump Installation Operation Instructions sheet E 10 RCD PDL681 VMP IMPORTANT Your spa has been factory tested and approved It is the responsability of the installe...

Страница 7: ...ers wire brushes or other metal tools One of the powder type detergents may be used on a damp cloth to provide mild abrasive action to the residual plaster A 2 Mequiars 28 A Consumer Responsibilities...

Страница 8: ...r after purchase Implied warranties including that of merchantability and fitness for a particular purpose are expressly limited in duration to the duration of this warranty Kohler China disclaims any...

Отзывы: