
2. Prepare the Carrier
Position the carrier face down on the floor.
Using a hex wrench, loosen the nuts securing the legs to the
carrier.
Raise the carrier 8
″
(203 mm) - 10
″
(254 mm) high to allow access
to the feet.
Tighten the nuts securing the legs to the carrier.
Mounting
Frame
PVC
Elbow
Front View
Drain
Clamp
1247365-2-B
6
Kohler Co.