background image

Installation Guide

Pedicure Spa

K-163, K-1006, K-1011,

K-1012

1063564-2-D

Содержание K-1006

Страница 1: ...Installation Guide Pedicure Spa K 163 K 1006 K 1011 K 1012 1063564 2 D...

Страница 2: ...mation Electrical Requirements The installation must have a Class A Ground Fault Circuit Interrupter GFCI The GFCI protects against line to ground shock hazard Use a 120 V 15 A 60 Hz dedicated service...

Страница 3: ...oute Plumbing 6 Install the Footbath 7 Complete the Platform Framing 8 Prepare the Rough Deck Material 9 Begin Tiling the Platform 10 Install the Faucet and Air Switch 11 Cut the Pump Banding Straps 1...

Страница 4: ...he height of the stud framing accordingly to meet the required finished height of the deck Observe all local plumbing and building codes including backflow protection The footbath is designed for tile...

Страница 5: ...nstructed later Construct the platform framing according to the illustration above Cover the kick plate with plywood Lay the two footbath sled supports onto the stacked 2x4 supports but do not secure...

Страница 6: ...the platform as the faucet Determine which side of the footbath that the faucet will be installed Temporarily slide the footbath sled into the framing Position the footbath sled a minimum of 8 1 4 21...

Страница 7: ...drain Install the drain to the footbath according to the instructions packed with the drain Slide the footbath sled into the framing Position according to the pencil marks on the framing If necessary...

Страница 8: ...e the front footbath jet This bump out will allow the technician to sit closer to the footbath basin Install the bump out to complete the platform framing 3 7 6 cm 9 1 2 24 1 cm 7 3 4 19 7 cm 3 1 2 8...

Страница 9: ...3 cm x 12 30 5 cm and located directly over the pump Mark the cutout for the footbath and access panel onto the deck material Cut out the opening for the footbath and access panel in the deck material...

Страница 10: ...he platform Mark the hole locations for the faucet handspray air switch and K 1011 client chair if used legs Refer to the above illustration for hole sizes drill the holes for the faucet handspray air...

Страница 11: ...eed the tube through the air switch hole Insert the air switch assembly into the hole and press firmly Wipe away any excess sealant Slide the nut over the tube Secure the air switch assembly to the pl...

Страница 12: ...the footbath to a level at least 2 5 1 cm above the highest jet Press the air switch to turn on the footbath Allow the footbath to run for approximately 5 minutes and check all piping connections for...

Страница 13: ...11 Complete the Platform Cover the platform opening and finish tiling the side of the platform Finish tile here Tile Cover and complete tile installation Kohler Co 13 1063564 2 D...

Страница 14: ...e warm water and a liquid detergent to clean the surface Remove stubborn stains paint or tar with turpentine or paint thinner Do not allow cleaners containing petroleum distillates to remain in contac...

Страница 15: ...ousing and lightly push and rotate the jet until it snaps into position Do not force the jet NOTE When installed correctly the jet should turn smoothly both clockwise and counterclockwise Troubleshoot...

Страница 16: ...t work G Rebuild or replace motor pump 2 Motor starts not all jets are functioning A Jet is closed A Rotate jet trim ring counterclockwise to open B Jet is not installed correctly B Reinstall jet chec...

Страница 17: ...1063564 2 D...

Страница 18: ...1063564 2 D...

Страница 19: ...1063564 2 D...

Страница 20: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 M xico 001 877 680 1310 kohler com 2007 Kohler Co 1063564 2 D...

Отзывы: