KGP-922
Chapter 7 Installation
0093130022-00 7-1
Chapter 7 Installation
7.1 Installation consideration
Qualified service technicians should perform the installation of the KGP-922 series that comprises the
following operations.
(1) Unpacking each component of the system.
(2) Inspection of the exterior of each component unit and accessory.
(3) Chec
king the ship’s mains voltage and current capacity.
(4) Determining the installation site.
(5) Installing the Display unit.
(6) Planning the cable routing and connections.
(7) Adjustment and setups.
7.2 Unpacking of the goods
Unpack your package and check if all of the items stated in the packing list are contained in the
package. If not, report this to an insurance agent for tracing missing goods or refund.
No.
Name of item
Type
Remark
Qty
1
Display unit
KGP-922.MU
With mounting bracket and
hard cover
1
2
DC power cable
CW-276-2M
With a 5-pin connector and
one end plain
1
3
Antenna unit
GA-09(IMO)[15M]
With 3D-2V coaxial cable
1
4
Installation material
TPT5X20U
Truss tapping screw
4
5
Operation Manual
KGP-922.OM.E
English
1
Note:
Option of equipment is not included.
7.2.1 Inspection of the goods
Carefully check the exterior of each component unit for dents, damage, etc. Also check the inside of
component units for electrical and mechanical damages.
Содержание KGP-922
Страница 1: ......
Страница 2: ......
Страница 16: ... This page intentionally left blank ...
Страница 26: ...Chapter 1 Basic Operation KGP 922 1 10 0093130022 00 Press ENT ...
Страница 44: ...Chapter 2 Various Navigation KGP 922 2 18 0093130022 00 3 Press key to display T RNG T TTG ...
Страница 96: ... This page intentionally left blank ...
Страница 104: ... This page intentionally left blank ...
Страница 120: ... This page intentionally left blank ...
Страница 136: ......