Final Checkout
981088 – September 1995
73
Section 16: Final Checkout
Checking for Correct Operation of the PROCESSOR
[1] Check all HOSES and connections for leaks. If leaks are observed, do the following steps.
(a) De-energize the PROCESSOR by moving the MAIN CIRCUIT BREAKER CB1 to the “O” position.
(b) Disconnect the main power from the PROCESSOR.
(c) Tighten the HOSE CLAMPS, as necessary.
[2] If no leakage occurs, remove the INTERLOCK TOOL from the AC INTERLOCK SWITCH S5 and remove
the MAGNET from DC INTERLOCK SWITCH S6 on the DRYER PLENUM BRACKET.
[3] Install the DRIVE SIDE ACCESS PANEL onto the PROCESSOR and tighten the 2 SCREWS to secure it.
[4] Install the TOP COVER onto the PROCESSOR.
[5] Check that all ACCESS PANELS are installed on the PROCESSOR.
Transport Test
[1] Rotate the DRYER TEMPERATURE CONTROL KNOB, located on the DISPLAY PANEL on the front of
the PROCESSOR, so that the POINTER on the KNOB points straight up
↑
.
Note
If you are turning the DRYER TEMPERATURE CONTROL KNOB from its full counterclockwise
position, you
will feel 5 detents as you turn the KNOB to its upright position.
[2] Wait for the PROCESSOR to warm up and for the READY INDICATOR to remain illuminated, approximately
15 - 45 minutes depending on the site conditions.
Figure 64
Installing the DRYER TEMPERATURE
CONTROL KNOB
[3] Feed either a sheet of cleanup film or a 35 x 43 cm
(14 x 17 in.) sheet of pre-exposed, non-
processed film into the PROCESSOR. Guide the
shorter edge of the film along the drive-side (left)
edge of the FEED TRAY when feeding the film.
If necessary, see the Operator Manual,
Publication Number 981089, for further
instructions on feeding film.
Note
The PROCESSOR will beep when the trailing edge of
the sheet of film has entered the PROCESSOR.
[4] Check that the sheet of film exits the DRYER
ASSEMBLY and drops into the RECEIVE BIN
approximately 96 seconds from the time you hear
the film feed signal.
Ready
Wait
Service
Dryer
Temperature
+
-
H130_0018AA
ON
-1-
-0-
OFF
CONTROL KNOB
DRYER TEMPERATURE
H130_0018ACC