ROTEX
®
Operating/Assembly instructions
KTR-N
Sheet:
Edition:
40210 EN
22 of 27
23
Please observe protection
note ISO 16016.
Drawn:
2019-07-02 Pz/Wb
Replacing:
KTR-N dated 2017-09-06
Verified:
2019-07-23 Pz
Replaced by:
Equipment category
Inspection intervals
3G
3D
For couplings operated in zone 2 or zone 22 the inspection and maintenance
intervals of the usual operating/assembly instructions for standard operation
apply. During the standard operation which has to be taken as a basis of the
ignition risk analysis the couplings are free from any ignition source. For gases,
vapours and dusts generated the permissible glow and ignition temperatures
specified in chapter 10.1 have to be considered and observed.
M2
2G
2D
No gases and vapours of
explosion group IIC
An inspection of the torsional backlash and a visual inspection of the flexible
spider/DZ elements must be performed after 3,000 operating hours for the first
time, at the latest after 6 months after start-up of the coupling.
If you note insignificant or no wear on the spider/DZ elements upon this initial
inspection, further inspections can each be performed after 6,000 operating
hours or at the latest after 18 months, provided that the operating parameters
remain the same.
If you note significant wear during the initial inspection so that it would be
recommendable to replace the spider/DZ elements, find out the cause
according to the table „Breakdowns“, if possible.
The maintenance intervals must be adjusted to the modified operating
parameters without fail.
M2
2G
2D
Gases and vapours of
explosion group IIC
An inspection of the torsional backlash and a visual inspection of the flexible
spider/DZ elements must be performed after 2,000 operating hours for the first
time, at the latest after 3 months after start-up of the coupling.
If you note insignificant or no wear on the spider/DZ elements upon this initial
inspection, further inspections can each be performed after 4,000 operating
hours or at the latest after 12 months, provided that the operating parameters
remain the same.
If you note significant wear during the initial inspection so that it would be
recommendable to replace the spider/DZ elements, find out the cause
according to the table „Breakdowns“, if possible.
The maintenance intervals must be adjusted to the modified operating
parameters without fail.
Hubs, clamping hubs or similar types without feather keyways may be used in category 3
only and are marked with category 3 accordingly.
10
Enclosure A
Advice and instructions regarding the use in
potentially explosive atmospheres
10.2 Inspection intervals for couplings in
potentially explosive atmospheres
Содержание N630 EX
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 144: ...KNF worldwide You can find our local KNF partners at www knf com...