
Diaphragm pump N820.18 CN / N840.18 CN
Commissioning
Translation of Original Operating Instruction, KNF 317428-338560 06/22
21
8.1 Preparing for commissioning
Before turning on the pump, make sure of the following
points:
Necessary operating requirements
Pump
- Connect all hoses correctly
Pump
- The voltage supply system is consistent with
the details on the type plate of the pump.
- Pump outlet not closed or restricted.
- When operating with gas ballast: When vent-
ing the pump through the air inlet, no explosive
or poisonous mixtures can occur.
Tab.11: Operating requirements for commissioning
EN
-
US
EN