23
5.5 Initial commissioning of the grinding machine
Place the honing machine on a level table with a height of roughly 60 cm on the installation site.
Have a qualified electrician on site install the current supply.
Completely install and check the safety devices before commissioning
Have all the safety devices checked for proper function by trained
personnel before commissioning.
CAUTION
.
5. Installation