
24
Installation and connection
HOME
If the valve is controlled by
HOME
, it has priority over control via
RS-232 or manual operation. As long as the switch-off signal is
not cancelled, the valve cannot be started. The indicator of the
position flashes to indicate that the start of the valve is pre-
vented by an external signal.
BIN 0–3
If the DIP switches were set to binary operation, then the con-
nections BIN 0–BIN 2 are available as inputs. The output BIN 3
is active in the valve positions 1–6.
On the 13P/1C and 17P/1C valves, BIN 3 is defined as an input
so that the positions 9–12 or 9–16 can be used.
Note:
The binary input is inactive during the change of the
valve position. This can be used to control further
external devices.
Signal
Explanation
GROUND
Ground connection for start and error sig-
nals
HOME/POS. 1
Connection for short circuit for creating
a switch signal:
Valve drive is set to position 1.
FORWARD/
LOADING
Connection for short circuit for creating
a switch signal, example for output:
LOADING
Set the position of the valve to the next
higher one, e. g. from position 2 to posi-
tion 3
BACKWARD/
INJECTING
Connection for short circuit for creating
a switch signal, example for output:
INJECTING
Set the position of the valve to the next
lower one, e. g. from position 6 to posi-
tion 5
OUT
Connection for short circuit (no current)
INJECTING, position 1, low-impedance
LOADING, position 2–6 or 2–16, high-
impedance