5. Operation
5.1 Initial startup
Use this checklist to determine whether the detector is ready for initial
startup:
Device is positioned in the correct location.
The power plug is connected.
If the device is part of an HPLC system, you should also note the
following:
The network connection to the router is established
The chromatography software has been installed by KNAUER or a
com pany authorized by KNAUER.
A flow cell is inserted.
The capillaries are connected.
5.2 Switch on
Note:
For warmup time information see page 34.
Installation is completed.
A clean flow cell was inserted.
Process
Steps
Figure
1.
On the rear of the device,
plug the power cable into the
power connector
2
.
2.
Plug in the power supply.
3.
On the rear of the device,
switch on the detector using
the power switch
1
.
1
2
Fig. 22
Power switch with female
connector at the rear panel
The detector starts its self-validation. If the self-validation has been suc-
cessfully completed, the LEDs on the right and in the center light up
green.
Bring the detector into operation.
Prerequisites
Device defect
Changes of the environmental temperature cause condensation inside
the device.
Allow device to acclimate for 3 h before connecting to power supply
and taking into operation.
Result
Next step(s)