Installation 13
AZURA® Conductivity Monitor CM 2.1S Instructions, V6710
4.2.1 Attaching CM flow cell to conductivity monitor
Device defect
Device damage possible.
Î
Switch off the device before mounting/dismounting the flow
cell.
Î
Observe the notes in chapter „Replacing the CM flow cell“ on
The device has been switched off.
Hexagon wrench, size 1.5 mm
Process
Figure
1.
Plug the CM flow cell onto the
socket
1
on the front side of
the conductivity monitor.
2.
Using the wrench, tighten the
2 outer screws
2
.
2
Connect the capillaries.
4.2.2 Connecting the capillaries of the CM flow cell
The device has been switched off.
The capillaries belong to the flow cell and can not be removed. To integ-
rate the flow cell into the FPLC/HPLC flow path, use the supplied cou-
plings to con nect the capillaries.
INLET: Connect one capillary end of the CM flow cell to the column or
downstream detector.
OUTLET: Connect the other capillary end to the waste or intermediate
instruments such as pH electrode, pressure sensor, fraction collector,
etc.
Install the pH monitor at the connection on the front side of the monitor
(s. Fig. 1, Nr.
3
), or close the connection using the BNC blind plug sup-
plied in the scope of delivery.
Prerequisites
Tools
Tools
1
Next steps
Prerequisites
Process
Next steps (optional)