
AZURA® Pump P 2.1L Instructions V6840
Installation and initial startup 23
4.8
Leak management
The leak management consists of the leak sensor and the drainage sys-
tem (funnels, hoses, nozzles). The drainage system ensures that escaping
liq uids flow into a waste bottle. When leaks are registered by the leak
sen sor, the LED flashes red. Both the device and the data acquisition via
chromatography software are stopped.
The front cover has been removed.
Process
Figure
Procedure
1.
Carefully push the funnel
1
into the center opening of the
capillary guide
2
.
Fig. 20:
1
2
Funnel and capillary
guide
2.
Push the long ending of the
first nozzle
4
into the hose
3
.
Fig. 21:
3
4
Hose and nozzle
3.
Connect the nozzle and the
fun nel.
4.
Push the other end of the hose
onto the nozzle
5
of the leak
tray.
Fig. 22:
5
Hose connected to
device
5.
For the bottom device, push
the short end of the nozzle
6
into the opening in the collec-
tion point of the leak tray.
6.
Connect the hose to the nozzle
and lead the second ending to
the waste bottle.
7.
Place the waste bottle below
the bottom device.
Fig. 23:
6
Leak tray with nozzle
Attach the front cover.
Prerequisite
Next step