62
1"- 2"
"C"
"D"
LEVELING IMPLEMENT TOOL BAR
Leveling Side To Side
Leveling Front To Rear
For best results, when leveling the implement, position the tractor with implement on a level floor.
Check tractor tire pressure and inflate equally from side to side. See your tractor operator’s manual for
correct tire inflation pressure.
With the implement attached to tractor, raise the unit 1 to 2 inches off the floor. Shut-off engine and
lock brakes on tractor. Measure to the bottom edge of the rear toolbar tube on each side of the
machine. Toolbar will be level when dimension “A” is the same as dimension “B” as shown in drawing
above. Level toolbar from side to side by adjusting the lift links on tractor 3-point hitch.
Before adjusting 3-point links see your tractor operator’s manual for correct adjustment procedures
and safety requirements.
Ground Line
"B"
"A"
1" - 2"
Before setting the Gauge wheels it is necessary to level the toolbar from the front to the rear. For
initial adjustment keep the machine raised off the ground 1 to 2 inches (being sure bottom of shanks
clear floor). Measure from the floor to the bottom of the front toolbar tube and the rear toolbar tube. If
toolbar is not level from front to rear with ground line, extend or retract the tractor top link until toolbar
is parallel ( or level) to the ground line. Toolbar will be level when dimension “C” is the same as
dimension “D”. Further front to back adjustment will be required once machine is operated in the field.
When properly leveled, all tillage components will enter the ground uniformly.
Rear Toolbar
Front
Toolbar
* NOTE: ALL HEIGHT DIMENSIONS GIVEN
IN THIS SECTION ASSUME TOOLBAR IS
RUNNING LEVEL TO THE GROUND.
Содержание 68 Series
Страница 15: ...13 SAE GRADE 5 SAE GRADE 8 BOLT TORQUE CHART ...
Страница 25: ...23 ...